Folly Farm WMF
(Redirected from Folly Farm Landfill)
Folly Farm Landfill | |
See SNRHW → page for a wider UK perspective. | |
Waste Licence | SP3239BB (SP3239BB) |
Operator | Shotley Holdings Ltd |
Void
Year | Total Void[1] |
---|---|
2018 | 574127 |
2019 | 575639 |
2020 | 561222 |
Summary site information collated from a variety of sources
including: Monksleigh, Ellard Associates, EA, WasteDataFlow,
SEPA, NRW, DEFRA, BEIS and owner and developer websites
Summary
Text to be added
History
Text to be added
Title
Text to be added
Waste Tonnage, EWC List
The table shows a list of the Waste for the Permit SP3239BB, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated in October 2023. The total reported tonnage arriving at the site was: 92,561.27t.
EWC Code | Description | Tonnes In |
---|---|---|
17 01 07 | mixtures of concrete, bricks, tiles and ceramics other than those mentioned in 17 01 06 | 9677.30 |
17 06 01* | insulating materials containing asbestos | 156.44 |
20 03 01 | mixed municpal waste | 7632.44 |
17 08 02 | gypsum-based construction materials other than those mentioned in 17 08 01 | 3328.20 |
17 04 07 | mixed metals | 410.40 |
17 02 03 | plastic | 14.75 |
17 06 05* | construction materials containing asbestos | 4317.29 |
17 09 04 | mixed construction and demolition wastes other than those mentioned in 17 09 01, 17 09 02 and 17 09 03 | 44793.55 |
19 12 09 | minerals (e.g. sand, stones) | 1805.74 |
20 02 01 | biodegradable waste | 9.20 |
17 02 01 | wood | 681.18 |
17 05 04 | soil and stones other than those mentioned in 17 05 03 | 19734.78 |
References
- ↑ Units are in m3 for England and Wales, and Tonnes for Scotland.