<script async src="https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js?client=ca-pub-3794604158822328"
     crossorigin="anonymous"></script> <?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en-GB">
	<id>https://wikiwaste.org.uk/index.php?action=history&amp;feed=atom&amp;title=Riverside_Energy_Park_%28REP%29</id>
	<title>Riverside Energy Park (REP) - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://wikiwaste.org.uk/index.php?action=history&amp;feed=atom&amp;title=Riverside_Energy_Park_%28REP%29"/>
	<link rel="alternate" type="text/html" href="https://wikiwaste.org.uk/index.php?title=Riverside_Energy_Park_(REP)&amp;action=history"/>
	<updated>2026-05-04T11:05:16Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.1</generator>
	<entry>
		<id>https://wikiwaste.org.uk/index.php?title=Riverside_Energy_Park_(REP)&amp;diff=22487&amp;oldid=prev</id>
		<title>Bin52: add page specific text</title>
		<link rel="alternate" type="text/html" href="https://wikiwaste.org.uk/index.php?title=Riverside_Energy_Park_(REP)&amp;diff=22487&amp;oldid=prev"/>
		<updated>2022-12-09T16:32:48Z</updated>

		<summary type="html">&lt;p&gt;add page specific text&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{#vardefine: epr|GP3535QS}}&lt;br /&gt;
[[Category:EfW Plants]]&lt;br /&gt;
An [[EfW]] facility based upon conventional combustion technology, [[Riverside Energy Park (REP)]] has permitted operational capacity of 650,000 tonnes per annum and reached financial close on the 9th December 2022&amp;lt;ref name=&amp;#039;ref1&amp;#039;&amp;gt;https://www.corygroup.co.uk/media/news-insights/cory-reaches-financial-close-uks-most-efficient-energy-waste-facility/&amp;lt;/ref&amp;gt;. It is located adjacent to [[Cory]]&amp;#039;s operational [[Riverside Resource Recovery Facility (RRRF)]] on the banks of the River Thames.&lt;br /&gt;
{{EfWTemplate|EPR={{#var: epr}}|id=69}}&lt;br /&gt;
[[File:Screenshot 2022-12-09 161032.png|350px|left|Artist Impression of Riverside Energy Park, All right reserved Cory ]]__TOC__&amp;lt;br clear=&amp;#039;left&amp;#039;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Summary==&lt;br /&gt;
An [[EfW]] facility based upon conventional combustion technology, [[Riverside Energy Park (REP)]] has permitted operational capacity of 650,000 tonnes per annum and reached financial close on the 9th December 2022&amp;lt;ref name = &amp;#039;ref1&amp;#039;/&amp;gt;. It is located adjacent to [[Cory]]&amp;#039;s operational [[Riverside Resource Recovery Facility (RRRF)]] on the banks of the River Thames.&lt;br /&gt;
&lt;br /&gt;
==Technology==&lt;br /&gt;
The plant is to be delivered by [[Hitachi Zosen Inova]] under a Design &amp;amp; Build [[EPC]]-turnkey contract&amp;lt;ref name = &amp;#039;ref1&amp;#039;/&amp;gt; - using the same standard [[combustion]] technology, air cooled, [[Hitachi Zosen Inova]] [[Grate]] as the adjacent operational plant. &lt;br /&gt;
&lt;br /&gt;
==Construction==&lt;br /&gt;
The plant is to commence construction in January 2023 with operation due to commence in 2026&amp;lt;ref name = &amp;#039;ref1&amp;#039;/&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
==Waste Input==&lt;br /&gt;
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. It is understood that the company will continue to engage with the market to secure waste for the plant in East London and the surrounding areas&amp;lt;ref&amp;gt;https://www.letsrecycle.com/news/cory-reaches-financial-close-on-riverside-2/&amp;lt;/ref&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references /&amp;gt;&lt;/div&gt;</summary>
		<author><name>Bin52</name></author>
	</entry>
</feed>