The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. BWSC were appointed the EPC contractor and O&M contractor for the project<ref name="GIB" />. | The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. BWSC were appointed the EPC contractor and O&M contractor for the project<ref name="GIB" /> with AET designing, supplying and commissionning the boiler, flue gas and combustion systems, the latter of which is based upon the travelling grate (AET Biograte) system<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>. | ||