|
|
(One intermediate revision by one other user not shown) |
Line 1: |
Line 1: |
| | #redirect [[Lancing EfW]] |
| [[Category:Biomass EfW Plants]] | | [[Category:Biomass EfW Plants]] |
| {{BiomassPlant|NAME=Lancing Biomass Plant|id=48}}
| |
|
| |
| ==Summary==
| |
| A [[Biomass EfW]] facility based on 40,000 tonnes per annum of waste wood producing 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste<ref name="ref1">Lets Recycle, 2007. [https://www.letsrecycle.com/news/latest-news/plans-unveiled-for-10m-biomass-plant-in-sussex/ Plans Unveiled For 10M Biomass Plant In Sussex - Letsrecycle.Com. Online. letsrecycle.com. [Accessed 16 April 2020].]</ref>
| |
|
| |
| The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd<ref name="ref2">Rabbit Group, 2020. [https://www.rabbitgroup.co.uk/energy-from-waste.htm Energy From Waste Facility For Green Waste Disposal & Recycling UK. Online. Rabbitgroup.co.uk. [Accessed 16 April 2020].]</ref>
| |
|
| |
| ==Plant==
| |
| The facility cost £10m to develop<ref name="ref1"/> and is collocated with recycling operations<ref name="ref2"/>.
| |
|
| |
| ==Local Authority Users==
| |
|
| |
| ==References==
| |
| <references/>
| |