The plant became operational in 2019 at a cost of c.£160m<ref name="Marg" />. | The plant became operational in 2019 at a cost of c.£160m<ref name="Marg" />. | ||
The Margam plant takes waste wood that is supplied by Stobart Biomass on a long term contract. The waste wood is sourced and supplied by Stobart from across the country at a rate of approximately 6,000 tonnes per week<ref name="Marg" />. The plant is also capable of processing | The Margam plant takes waste wood that is supplied by Stobart Biomass on a long term contract. The waste wood is sourced and supplied by Stobart from across the country at a rate of approximately 6,000 tonnes per week<ref name="Marg" />. The plant is also capable of processing contaminated wood and fuel containing metals with no pre-treatment required. The facility is also able to take municipal waste as a fuel source in the future if required<ref name="BVV" />. | ||