==Summary== | ==Summary== | ||
A Biomass Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility utilising a feedstock of [[Wood Waste]] to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the [[Wood Waste]] is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works<ref name="ref1" >E.ON, 2020. [https://www.eonenergy.com/business/why-eon/case-studies/blackburn-meadows.html Blackburn Meadows | Business Case Studies | E.ON. Online. Eonenergy.com. [Accessed 6 April 2020].]</ref>. | |||
The Blackburn Meadows facility is operated by [[E.ON Energy]] and became operational in 2015 after beginning construction in 2011<ref name="ref2" >BDP., 2018. [http://www.bdp.com/en/projects/a-e/blackburn-meadows-biomass-plant/ Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020].</ref>. | |||
The Blackburn Meadows facility is operated by E.ON Energy and became operational in 2015 after beginning construction in 2011<ref name="ref2" >BDP., 2018. [http://www.bdp.com/en/projects/a-e/blackburn-meadows-biomass-plant/ Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020].</ref>. | |||
==Plant== | ==Plant== | ||
The facility had a 10 MW battery installed after it was awarded a contract to support the national grid’s stability requirements, which became operational in 2017<ref name="ref1"/>. | The facility had a 10 MW battery installed after it was awarded a contract to support the national grid’s stability requirements, which became operational in 2017<ref name="ref1"/>. | ||
| Line 22: | Line 16: | ||
The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020].</ref>. | The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020].</ref>. | ||
==Tonnage Input/Fuel== | |||
== | The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows: | ||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
|- | |||
| [[Wood Waste]] || '''208,327''' | |||
|- | |||
| Other || 0 | |||
|- | |||
| Total||208,327 | |||
|} | |||
The [[Wood Waste]] is received from a variety of sources. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was '''214,135''' tonnes. | |||