Beddington Farmlands Landfill Site: Difference between revisions
m →Title |
|||
| Line 32: | Line 32: | ||
Other Infrastructure | Other Infrastructure | ||
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste MRF, an In-vessel Composting (IVC) facility and an Energy-from-Waste facility. Several of these facilities are associated with contracts with the South London Waste Partnership. | Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste MRF, an In-vessel Composting (IVC) facility and an Energy-from-Waste facility. Several of these facilities are associated with contracts with the South London Waste Partnership. | ||
==Tonnage Handled== | ==Tonnage Handled== | ||