Haylers End Energy Recovery Plant: Difference between revisions
add page specific text |
m change picture |
||
| (2 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
{{#vardefine: epr|SP3507PN}}[[Category:High Temperature and Clinical Waste Incinerators]] | {{#vardefine: epr|SP3507PN}}[[Category:High Temperature and Clinical Waste Incinerators]] | ||
One of the most recent [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Haylers End Energy Recovery Plant]] will trade under the brand [[Clinitek]] and is referred to as their '''Malvern''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>.{{ClinIncin|EPR={{#var:epr}}|id=3}}[[File:Malvern-artists-impression.jpg|450px|left|Artist Impression of Malvern Plant - All rights reserved, Accessed from Cobalt website May 2021]]__TOC__ | |||
One of the most recent [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Haylers End Energy Recovery Plant]] will trade under the brand [[Clinitek]] and is referred to as their '''Malvern''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>. | |||
[[File:Malvern.jpg| | |||
<br clear='left'/> | <br clear='left'/> | ||
| Line 12: | Line 10: | ||
==Plant== | ==Plant== | ||
Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[ | Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[Incinco]]<ref name="P3P1" /> with 1,000kg/hr capacity and with construction oversight by [[Cobalt Energy]]<ref>[https://www.cobaltenergy.co.uk/our-projects/malvern-clinical-waste-incineration/ Cobalt Energy News Item]</ref>. At 8,000 hrs annual operation the maximum annual throughput would be 8,000 tonnes per annum, although the plated capacity has been reported as 6,400 tonnes in the past. | ||
==References== | ==References== | ||