Haylers End Energy Recovery Plant: Difference between revisions

Bin52 (talk | contribs)
add page specific text
 
Bin52 (talk | contribs)
m change picture
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{#vardefine: epr|SP3507PN}}[[Category:High Temperature and Clinical Waste Incinerators]]
{{#vardefine: epr|SP3507PN}}[[Category:High Temperature and Clinical Waste Incinerators]]
{{ClinIncin|EPR={{#var:epr}}|id=3}}
One of the most recent [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Haylers End Energy Recovery Plant]] will trade under the brand [[Clinitek]] and is referred to as their '''Malvern''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>.{{ClinIncin|EPR={{#var:epr}}|id=3}}[[File:Malvern-artists-impression.jpg|450px|left|Artist Impression of Malvern Plant - All rights reserved, Accessed from Cobalt website May 2021]]__TOC__
One of the most recent [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Haylers End Energy Recovery Plant]] will trade under the brand [[Clinitek]] and is referred to as their '''Malvern''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>.
[[File:Malvern.jpg|350px|left|Malvern Clinical Waste Incinerator - All rights reserved Andusia]]__TOC__
<br clear='left'/>
<br clear='left'/>


Line 12: Line 10:


==Plant==
==Plant==
Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[Icinco]]<ref name="P3P1" /> with 1,000kg/hr capacity and with construction oversight by [[Cobalt Energy]]<ref>[https://www.cobaltenergy.co.uk/our-projects/malvern-clinical-waste-incineration/ Cobalt Energy News Item]</ref>. At 8,000 hrs annual operation the maximum annual throughput would be 8,000 tonnes per annum, although the plated capacity has been reported as 6,400 tonnes in the past.
Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[Incinco]]<ref name="P3P1" /> with 1,000kg/hr capacity and with construction oversight by [[Cobalt Energy]]<ref>[https://www.cobaltenergy.co.uk/our-projects/malvern-clinical-waste-incineration/ Cobalt Energy News Item]</ref>. At 8,000 hrs annual operation the maximum annual throughput would be 8,000 tonnes per annum, although the plated capacity has been reported as 6,400 tonnes in the past.


==References==
==References==