Trident Park (Cardiff ERF): Difference between revisions

From Wikiwaste
Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
Line 15: Line 15:
The plant comprises 2 lines via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]].
The plant comprises 2 lines via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]].


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />

Latest revision as of 10:43, 18 June 2021

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[1]


Trident Park (Cardiff ERF)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence LP3030XA
Operator Viridor
Region Wales
Operational Capacity 425ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 30.00MWe
Number of Lines 2
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 272459.00 97287.00 0.00 0.00 369746.00
2020 276146.00 96789.00 5597.00 872.00 379404.00
2021 274829.00 99409.00 4164.00 0.00 378402.00
2022 247187.00 107313.00 5689.00 0.00 360189.00
2023 248500.00 155785.00 0.00 0.00 404285.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 201.18 0.05% 32.65 0.01%
2020 66547.00 17.54% 5573.00 1.47%
2021 75423.00 19.93% 8600.00 2.27%
2022 66868.00 18.56% 3859.00 1.07%
2023 71466.00 17.68% 4481.00 1.11%


Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[2]

History

The Trident Park facility was built primarily to service a 25 year PPP contract signed in December 2013 [3] by Cardiff on behalf of the Prosiect Gwyrdd (Project Green) partnership of five local authorities in South Wales ( Cardiff, Newport, Monmouthshire, Vale of Glamorgan and Caerphilly), with an anticipated input of 172,000 tonnes per annum of the total design capacity of 350,000 tonnes per annum - receiving additional residual Commercial Waste. It is located in Cardiff bay and has been operational since 2014.

Plant

Built by CNIM and Lagan which started in Spring 2012 and was delivered in 2014[4] at a reported [5] £206m capital cost. The plant comprises 2 lines via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste.

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on 2023-04-26. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 281,520.04t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage
Blaenau Gwent CBC 11669.952
Bridgend CBC 4462.770
Caerphilly CBC 40091.880
Cardiff County Council 73900.330
Carmarthenshire County Council 672.930
Ceredigion County Council 166.080
Merthyr Tydfil CBC 10239.307
Monmouthshire CC 14235.420
Neath Port Talbot CBC 6421.070
Newport City Council 26771.360
Pembrokeshire County Council 14617.150
Powys County Council 41.476
Rhondda Cynon Taff CBC 40857.840
Somerset Waste Partnership 307.760
South Gloucestershire Council 260.920
Torfaen CBC 17888.020
Vale of Glamorgan Council 18915.770

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='LP3030XA' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='LP3030XA' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit LP3030XA, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References