Trident Park (Cardiff ERF): Difference between revisions

Northern Chick (talk | contribs)
Arctellion (talk | contribs)
No edit summary
 
(9 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[File:Viridor Trident Park.png|400px|left]]
{{#vardefine:epr|LP3030XA}}
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=LP3030XA|id=10}}
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref>
 
{{EfWTemplate|EPR={{#var:epr}}|id=10}}
[[File:Viridor Trident Park.png|400px|left]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref>
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref>
Line 11: Line 13:
==Plant==
==Plant==
Built by [[CNIM]] and [[Lagan]] which started in Spring 2012 and was delivered in 2014<ref>[https://laganscg.com/news/lagan-construction-is-awarded-50-million-energy-from-waste-contract-in-cardiff Lagan Website]</ref> at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £206m capital cost.
Built by [[CNIM]] and [[Lagan]] which started in Spring 2012 and was delivered in 2014<ref>[https://laganscg.com/news/lagan-construction-is-awarded-50-million-energy-from-waste-contract-in-cardiff Lagan Website]</ref> at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £206m capital cost.
The plant comprises 2 lines via standard combustion technology Martin reverse acting grate, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]].
The plant comprises 2 lines via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]].


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}


{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />