Trident Park (Cardiff ERF): Difference between revisions
m →History: typo |
Arctellion (talk | contribs) No edit summary |
||
| (9 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|LP3030XA}} | ||
[[ | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref> | ||
{{EfWTemplate|EPR={{#var:epr}}|id=10}} | |||
[[File:Viridor Trident Park.png|400px|left]]__TOC__ | |||
<br clear='left' /> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref> | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref> | ||
| Line 11: | Line 13: | ||
==Plant== | ==Plant== | ||
Built by [[CNIM]] and [[Lagan]] which started in Spring 2012 and was delivered in 2014<ref>[https://laganscg.com/news/lagan-construction-is-awarded-50-million-energy-from-waste-contract-in-cardiff Lagan Website]</ref> at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £206m capital cost. | Built by [[CNIM]] and [[Lagan]] which started in Spring 2012 and was delivered in 2014<ref>[https://laganscg.com/news/lagan-construction-is-awarded-50-million-energy-from-waste-contract-in-cardiff Lagan Website]</ref> at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £206m capital cost. | ||
The plant comprises 2 lines via standard combustion technology Martin | The plant comprises 2 lines via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]]. | ||
= | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||