An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Lakeside EfW]] has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy from Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]] would have necessitated the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref> most recently reported in late 2020 as withdrawn as an application in [[DEFRA]] data.
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Lakeside EfW]] has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy From Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]] would have necessitated the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref> most recently reported in late 2020 as withdrawn as an application in [[DEFRA]] data.
{{EfWTemplate|EPR={{#var:epr}}|id=8}}
{{EfWTemplate|EPR={{#var:epr}}|id=8}}
[[File:Viridor Lakeside.png|370px|left|Viridor Lakeside]]__TOC__
[[File:Viridor Lakeside.png|370px|left|Viridor Lakeside]]__TOC__
Line 14: Line 14:
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).