Four Ashes EfW (Staffordshire ERF) (W2R): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
Line 18: Line 18:
The facility has been built with technologies developed by Veolia in partnership with [[CNIM]] [[Clugston]] Staffordshire Ltd, with the EPC work carried out by CNIM. The combustion technology comprises of two 20 t/h incineration lines of the CNIM/Martin GmbH reverse-acting grate system with two lines, a CNIM-designed horizontal boiler and a SecoLAB© flue ash treatment system supplied by LAB, a Group CNIM company<ref>CNIM, 2016. [https://cnim.com/en/staffordshire-new-erf-zero-landfill A turnkey energy recovery facility at Four Ashes | CNIM. Online. Cnim.com.[Accessed 7 Feb. 2020].]</ref>.
The facility has been built with technologies developed by Veolia in partnership with [[CNIM]] [[Clugston]] Staffordshire Ltd, with the EPC work carried out by CNIM. The combustion technology comprises of two 20 t/h incineration lines of the CNIM/Martin GmbH reverse-acting grate system with two lines, a CNIM-designed horizontal boiler and a SecoLAB© flue ash treatment system supplied by LAB, a Group CNIM company<ref>CNIM, 2016. [https://cnim.com/en/staffordshire-new-erf-zero-landfill A turnkey energy recovery facility at Four Ashes | CNIM. Online. Cnim.com.[Accessed 7 Feb. 2020].]</ref>.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />