North Yard EfW (Devonport EfW CHP Facility): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:Devonport.png|300px|left|MVV Devonport]]
{{#vardefine:epr|WP3833FT}}[[Category:EfW Plants]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Devonport has a permitted operational capacity of 265,000 tonnes per annum, and is owned and operated by [[MVV Environment]]. Delivery of waste is primarily by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. It is located in North Yard, next to Her Majesty's Naval Base Devonport.
{{EfWTemplate|EPR=WP3833FT|id=19}}
{{EfWTemplate|EPR={{#var:epr}}|id=19}}
 
[[File:Devonport.png|300px|left|MVV Devonport]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Devonport has a permitted operational capacity of 265,000 tonnes per annum, and is owned and operated by [[MVV Environment]]. Delivery of waste is primarily by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. It is located in North Yard, next to Her Majesty's Naval Base Devonport.
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Devonport has a permitted operational capacity of 265,000 tonnes per annum, and is owned and operated by [[MVV Environment]]. Delivery of waste is primarily by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. It is located in North Yard, next to Her Majesty's Naval Base Devonport.
Line 13: Line 14:
The plant comprises standard combustion technology, air cooled grate, generating super-heated steam <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/devonport-efw-chp-facility/facts-and-figures MVV Devonport Website]</ref>. It is configured to run on residual [[Household Waste]] and [[Commercial Waste]] to deliver 24MWe of power. [[MVV Environmental]] openly publish their annual plant performance report <ref>[https://www.mvv.de/fileadmin/user_upload/Ueber_uns/en/geschaeftsfelder_1/environment_1/plymouth/linksanddownloads/annual_performance_reports/Annual_Performance_Report_MED_2018.pdf Annual Plant Performance Report]</ref>
The plant comprises standard combustion technology, air cooled grate, generating super-heated steam <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/devonport-efw-chp-facility/facts-and-figures MVV Devonport Website]</ref>. It is configured to run on residual [[Household Waste]] and [[Commercial Waste]] to deliver 24MWe of power. [[MVV Environmental]] openly publish their annual plant performance report <ref>[https://www.mvv.de/fileadmin/user_upload/Ueber_uns/en/geschaeftsfelder_1/environment_1/plymouth/linksanddownloads/annual_performance_reports/Annual_Performance_Report_MED_2018.pdf Annual Plant Performance Report]</ref>


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}
{{#clear_external_data:}}
 
{{#get_db_data: db=engy
|from=wdfincin|where=epr='WP3833FT'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />