Built by the predecessor of [[Hitachi Zosen Inova]], Von Roll Inova, under a Design & Build [[EPC]]-turnkey contract in a consortium with Hochief UK for civil engineering. Construction started in 2008 and was delivered 2011 at a reported<ref>[https://www.hz-inova.com/files/2014/11/Newhaven_ENG.pdf Hitcahi Zosen Inova pdf]</ref> GBP £260m capital cost.
Built by the predecessor of [[Hitachi Zosen Inova]], Von Roll Inova, under a Design & Build [[EPC]]-turnkey contract in a consortium with Hochief UK for civil engineering. Construction started in 2008 and was delivered 2011 at a reported<ref>[https://www.hz-inova.com/files/2014/11/Newhaven_ENG.pdf Hitcahi Zosen Inova pdf]</ref> GBP £260m capital cost.
The plant comprises 2 lines of 14.5 tonnes/hour design capacity capable of treating 226,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and up to 10% [[Clinical Waste]] with a [[CV]] of between 7.0 and 12.5MJ/kg to deliver 19.25MWe of power.
The plant comprises 2 lines of 14.5 tonnes/hour design capacity capable of treating 226,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and up to 10% [[Clinical Waste]] with a [[CV]] of between 7.0 and 12.5MJ/kg to deliver 19.25MWe of power.