An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Exeter has permitted operational capacity of 60,000 tonnes per annum, owned by [[Viridor]] and operated for them by [[Cyclerval]] for the first 5 years of its life. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/exeter-erf/ Viridor Website]</ref>.{{EfWTemplate|EPR={{#var: epr}}|id=42}}[[File:Viridor Exeter.png|320px|left|Viridor Exeter]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=HP3538CR|id=42}}
 
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Exeter has permitted operational capacity of 60,000 tonnes per annum, owned by [[Viridor]] and operated for them by [[Cyclerval]] for the first 5 years of its life. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/exeter-erf/ Viridor Website]</ref>.
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Exeter has permitted operational capacity of 60,000 tonnes per annum, owned by [[Viridor]] and operated for them by [[Cyclerval]] for the first 5 years of its life. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/exeter-erf/ Viridor Website]</ref>.
==History==
==History==
The Exeter facility was built primarily to service a [[PPP]] contract with [[Devon County Council|Devon]], servicing primarily [[Exeter City Council]] with anticipated total throughput of up to 60,000 tonnes per annum.  
The Exeter facility was built primarily to service a [[PPP]] contract with [[Devon County Council|Devon]], servicing primarily [[Exeter City Council]] with anticipated total throughput of up to 60,000 tonnes per annum.  
==Plant==
==Plant==
Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in July 2014 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £47m capital cost.
Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in July 2014 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £47m capital cost.
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe, but electrical capacity is shown as 13MWe.
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe, but electrical capacity is shown as 13MWe.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='HP3538CR'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}


{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />