Newlincs EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:Cyclerval Newlincs.png|350px|left|Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0]]
{{#vardefine:epr|BT4249IB}}[[Category:EfW Plants]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by [[Cyclerval-UK]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].{{EfWTemplate|EPR={{#var:epr}}|id=43}}[[File:Cyclerval Newlincs.png|350px|left|Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=BT4249IB|id=43}}


==Summary==
==Summary==
Line 13: Line 12:
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures.
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
 
{{#clear_external_data:}}
{{EAIn|EPR={{#var: epr}}}}
{{#get_db_data: db=engy
 
|from=wdfincin|where=epr='BT4249IB'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />