Newlincs EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
| Line 12: | Line 12: | ||
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures. | The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures. | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||