Lerwick Energy Recovery Plant (Shetland EfW Plant): Difference between revisions

From Wikiwaste
Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{#vardefine:epr|PPC/A/1003141}}[[Category:EfW Plants]]
{{EfWTemplate|EPR=PPC/A/1003141|id=44}}
The Energy Recovery Plant in Lerwick is operated by [[Shetland Isles Council]] which burns over 23,000 tonnes of waste per year and generates 7MW of energy providing heat and hot water for the Lerwick District Heating System which is operated by the [[Shetland Heat Energy and Power Ltd]] (SHEAP)<ref>https://www.shetland.gov.uk/rubbish-recycling/education.asp</ref> <ref>https://waste-management-world.com/a/shetland-islands-waste-to-energy-facility-gets-upgraded-controls</ref>.{{EfWTemplate|EPR={{#var:epr}}|id=44}}[[File:Lerwick Shetland EFW.jpg|230px|left|Shetland EfW Plant]]__TOC__<br clear='left' />
 


[[File:Lerwick Shetland EFW.jpg|400px|left|Shetland EfW Plant]]
==Summary==
==Summary==
The Energy Recovery Plant in Lerwick is operated by [[Shetland Isles Council]] which burns over 23,000 tonnes of waste per year and generates 7MW of energy providing heat and hot water for the Lerwick District Heating System which is operated by the [[Shetland Heat Energy and Power Ltd]] (SHEAP)<ref>https://www.shetland.gov.uk/rubbish-recycling/education.asp</ref> <ref>https://waste-management-world.com/a/shetland-islands-waste-to-energy-facility-gets-upgraded-controls</ref>.
The Energy Recovery Plant in Lerwick is operated by [[Shetland Isles Council]] which burns over 23,000 tonnes of waste per year and generates 7MW of energy providing heat and hot water for the Lerwick District Heating System which is operated by the [[Shetland Heat Energy and Power Ltd]] (SHEAP)<ref>https://www.shetland.gov.uk/rubbish-recycling/education.asp</ref> <ref>https://waste-management-world.com/a/shetland-islands-waste-to-energy-facility-gets-upgraded-controls</ref>.
Line 14: Line 14:


==Plant==
==Plant==
The thermal efficiency of the plant in terms of heat recovered is 80%. The capital cost of the plant was approximately £10m and the district heating network a further £11.5m. The cost of installing the heat exchangers per propoerty to allow the heat to be used was between £2,000-£5,000.<ref>https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/221036/pb13889-incineration-municipal-waste.pdf</ref>.
The thermal efficiency of the plant in terms of heat recovered is 80%. The capital cost of the plant was approximately £10m and the district heating network a further £11.5m. The cost of installing the heat exchangers per propoerty to allow the heat to be used was between £2,000-£5,000.<ref>https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/221036/pb13889-incineration-municipal-waste.pdf</ref>.


The Shetland EfW facility has an anticipated life span of 10-15 years under current maintentance programmes<ref>https://www.orkney.gov.uk/Files/Committees-and-Agendas/Development%20and%20Infrastructure/DI2018/26-09-2018/I06__Proposed_New_Waste_Management_Facilities.pdf</ref>
The Shetland EfW facility has an anticipated life span of 10-15 years under current maintentance programmes<ref>https://www.orkney.gov.uk/Files/Committees-and-Agendas/Development%20and%20Infrastructure/DI2018/26-09-2018/I06__Proposed_New_Waste_Management_Facilities.pdf</ref>


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
 
{{#clear_external_data:}}
{{EAIn|EPR={{#var: epr}}}}
{{#get_db_data: db=engy
 
|from=wdfincin|where=epr='PPC/A/1003141'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />

Latest revision as of 19:19, 18 June 2021

The Energy Recovery Plant in Lerwick is operated by Shetland Isles Council which burns over 23,000 tonnes of waste per year and generates 7MW of energy providing heat and hot water for the Lerwick District Heating System which is operated by the Shetland Heat Energy and Power Ltd (SHEAP)[1] [2].

Lerwick Energy Recovery Plant (Shetland EfW Plant)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence PPC/A/1003141
Operator Shetland Heat Energy & Power (SHEAP)
Region Scotland
Operational Capacity 24ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 7.00MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 19270.40 0.00 1311.74 0.00 20749.00
2020 22575.72 0.00 107.46 0.00 22786.02
2021 18886.28 0.00 58.36 0.00 19054.76
2022 22792.58 0.00 108.22 0.00 23065.86
2023 22762.00 0.00 82.00 0.00 22967.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2020 0.00 0.00% 0.00 0.00%
2021 0.00 0.00% 0.00 0.00%
2022 0.00 0.00% 0.00 0.00%
2023 0.00 0.00% 0.00 0.00%

Shetland EfW Plant
Shetland EfW Plant



Summary

The Energy Recovery Plant in Lerwick is operated by Shetland Isles Council which burns over 23,000 tonnes of waste per year and generates 7MW of energy providing heat and hot water for the Lerwick District Heating System which is operated by the Shetland Heat Energy and Power Ltd (SHEAP)[3] [4].

The waste to feed the plant originates from Shetland, Orkney and areas of the Highlands.

The hot water created from the destruction of the residual waste is used to heat approximately 1,230 domestic properties, commercial and public buildings around Lerwick including schools, care homes, the leisure centre and hospital[5] and distributed around the town via insulated pipes.

History

The facility has been operating successfully in Shetland since 2000 burning predominantly Household, Commercial and Industrial wastes and is the smallest of all the Local Authority Energy from Waste plants currently operating in the UK.[6]

Plant

The thermal efficiency of the plant in terms of heat recovered is 80%. The capital cost of the plant was approximately £10m and the district heating network a further £11.5m. The cost of installing the heat exchangers per propoerty to allow the heat to be used was between £2,000-£5,000.[7].

The Shetland EfW facility has an anticipated life span of 10-15 years under current maintentance programmes[8]

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage


Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit PPC/A/1003141, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2023. The total reported tonnage arriving at the site was: 11,398.16t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
18 01 04 Shetland Islands 39.24
18 01 04 Orkney Islands 5.86
19 12 10 Scotland 450.78
20 03 01 Shetland Islands 10806.22
02 01 02 Shetland Islands 62.70
20 01 08 Shetland Islands 9.08
20 01 08 Orkney Islands 24.28


References