Lerwick Energy Recovery Plant (Shetland EfW Plant): Difference between revisions

No edit summary
Arctellion (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
[[File:Lerwick Shetland EFW.jpg|230px|left|Shetland EfW Plant]]
{{#vardefine:epr|PPC/A/1003141}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
The Energy Recovery Plant in Lerwick is operated by [[Shetland Isles Council]] which burns over 23,000 tonnes of waste per year and generates 7MW of energy providing heat and hot water for the Lerwick District Heating System which is operated by the [[Shetland Heat Energy and Power Ltd]] (SHEAP)<ref>https://www.shetland.gov.uk/rubbish-recycling/education.asp</ref> <ref>https://waste-management-world.com/a/shetland-islands-waste-to-energy-facility-gets-upgraded-controls</ref>.{{EfWTemplate|EPR={{#var:epr}}|id=44}}[[File:Lerwick Shetland EFW.jpg|230px|left|Shetland EfW Plant]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=PPC/A/1003141|id=44}}
 


==Summary==
==Summary==
Line 14: Line 14:


==Plant==
==Plant==
The thermal efficiency of the plant in terms of heat recovered is 80%. The capital cost of the plant was approximately £10m and the district heating network a further £11.5m. The cost of installing the heat exchangers per propoerty to allow the heat to be used was between £2,000-£5,000.<ref>https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/221036/pb13889-incineration-municipal-waste.pdf</ref>.
The thermal efficiency of the plant in terms of heat recovered is 80%. The capital cost of the plant was approximately £10m and the district heating network a further £11.5m. The cost of installing the heat exchangers per propoerty to allow the heat to be used was between £2,000-£5,000.<ref>https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/221036/pb13889-incineration-municipal-waste.pdf</ref>.


The Shetland EfW facility has an anticipated life span of 10-15 years under current maintentance programmes<ref>https://www.orkney.gov.uk/Files/Committees-and-Agendas/Development%20and%20Infrastructure/DI2018/26-09-2018/I06__Proposed_New_Waste_Management_Facilities.pdf</ref>
The Shetland EfW facility has an anticipated life span of 10-15 years under current maintentance programmes<ref>https://www.orkney.gov.uk/Files/Committees-and-Agendas/Development%20and%20Infrastructure/DI2018/26-09-2018/I06__Proposed_New_Waste_Management_Facilities.pdf</ref>


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
 
{{#clear_external_data:}}
{{EAIn|EPR={{#var: epr}}}}
{{#get_db_data: db=engy
 
|from=wdfincin|where=epr='PPC/A/1003141'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />