Kemsley K3 EfW: Difference between revisions

Bin52 (talk | contribs)
m minor text change
Arctellion (talk | contribs)
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:K3.png|300px|left|Image of Kemsley 3 EFW]]
{{#vardefine:epr|JP3135DK}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR={{#var:epr}}|id=49}}[[File:Kemsley K3.jpg|350px|left|Kemsley K3 EFW - Whhelabrator website July 2020 all rights reserved]]__TOC__<br clear='left'/>
{{EfWTemplate|EPR=Tbc#05|id=49}}
 
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and presently in late stage construction. Kemsley (K3) has a current forecast operational capacity of 550,000 tonnes per annum with plans to extend (see Technology section below). The project has been developed and will be operated by [[Wheelabrator]] and was funded by the [[Green Investment Bank]], [[BTMU]], [[Natixis]] and [[Investec]]. The project reached financial close in September 2016 for GBP £340m<ref>[https://www.wtikemsley.co.uk/site/assets/files/1315/wheelabrator_news_release_-_kemsley_financial_close_-_28_july_2016_-_uk_final.pdf Wheelabrator Press Release]</ref>..
An [[EfW]] facility based upon conventional [[combustion]] technology, [[Kemsley K3 EfW]] was handed over for operation in July 2020<ref>https://www.nsenergybusiness.com/projects/wheelabrator-kemsley-k3-generating-station/</ref>  and had an original operational capacity of 550,000 tonnes per annum with an extension of 107,000 tonnes per annum approved in February 2021<ref>[https://www.gov.uk/government/news/wheelabrator-kemsley-generating-station-k3-and-wheelabrator-kemsley-north-wkn-waste-to-energy-facility-development-consent-decisions-announced gov.uk website PressRelease]</ref>. The project has been developed and will be operated by [[Wheelabrator]] and was funded by the [[Green Investment Bank]], [[BTMU]], [[Natixis]] and [[Investec]]. The project reached financial close in September 2016 for GBP £340m<ref>[https://www.wtikemsley.co.uk/site/assets/files/1315/wheelabrator_news_release_-_kemsley_financial_close_-_28_july_2016_-_uk_final.pdf Wheelabrator Press Release]</ref>..


==History==
==History==
Additional permitted capacity is being sought within the boundaries of the current consent and technology, through improved efficiency of the plant design, to process a further 107,000 tones per annum and generate an additional 25.1MW.
The additional permitted capacity was sought as part of an application for an additional project adjacent to the site ([[Kemsley North (WKN)]]) although this part of the application was refused by the [[Planning Inspectorate]]. The extension to the [[Kemsley K3 EfW]] was within the boundaries of the current consent and technology, through improved efficiency of the plant design, to allow the processing of the further 107,000 tones per annum to generate an additional 25.1MW.  
 
As part of the application to extend the existing capacity, in October 2019, an additional application was made for a further plant, adjacent to Kemsley (K3), called Wheelabrator Kemsley North ([[Wheelabrator Kemsley North|WKN]]). If consented it will deliver a single line of standard moving grate technology, producing super-heated steam and 42MWe from 390,0000 tonnes per annum of [[residual waste]].  
 
Both the K3 and [[Wheelabrator Kemsley North|WKN]] facilities are discrete, and in addition to a planned 'K4' gas-fired [[CHP]] facility on the same site. The combined capacity of 'K3', 'K3 extension', and [[Wheelabrator Kemsley North|WKN]] totals 1,047,000 tonnes per annum.


In December 2020 [[Wheelabrator]] announced the sale of their UK energy from waste division to the [[European Diversified Infrastructure Fund III]], a fund managed by [[First Sentier Investors]] (FSI) (formally known as First State Investments) headquartered in Australia<ref>https://www.letsrecycle.com/news/latest-news/wheelabrator-to-sell-uk-efw-arm/</ref> for completion in early 2021.  
In December 2020 [[Wheelabrator]] announced the sale of their UK energy from waste division to the [[European Diversified Infrastructure Fund III]], a fund managed by [[First Sentier Investors]] (FSI) (formally known as First State Investments) headquartered in Australia<ref>https://www.letsrecycle.com/news/latest-news/wheelabrator-to-sell-uk-efw-arm/</ref> for completion in early 2021.  


==Technology==
==Technology==
The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 49.9MW of electricity to grid and steam to the adjacent [[DS Smith]] papermill.  
The plant technology comprises 2 lines of a standard [[combustion]] moving [[grate]] technology, producing super-heated steam (49.9MW plus 25.1MW of thermal output) to generate electricity to grid and steam to the adjacent [[DS Smith]] papermill.  


==Construction==
==Construction==
The plant gained planning consent in 2012, reached financial close in July 2016, and will delivered by an [[EPC]] turnkey arrangement with [[CNIM]]. An operational date is programmed for mid 2020 <ref>[https://www.wtikemsley.co.uk/projects/project-overview/ Wheelabrator Website]</ref>.
The plant gained planning consent in 2012, reached financial close in July 2016, and was delivered by an [[EPC]] turnkey arrangement with [[CNIM]]. Handover was achieved in July 2020.  


==Waste Input==
==Waste Input==
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] sourced by [[Wheelabrator]].
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] sourced by [[Wheelabrator]].


{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />