Avonmouth RRC: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m add pic and update text
Arctellion (talk | contribs)
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:EfW Plants]]
{{#vardefine:epr|SP3301LA}}[[Category:EfW Plants]]
{{EfWTemplate|EPR=Tbc#06|id=50}}
An [[EfW]] facility based upon conventional [[combustion]] technology, [[Avonmouth RRC]] has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility will processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/ Viridor Website]</ref>
[[File:Avonmouth RRC.png|350px|left|Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved]]__TOC__
{{EfWTemplate|EPR={{#var:epr}}|id=50}}[[File:Avonmouth RRC.png|350px|left|Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved]]__TOC__<br clear='left'/>
<br clear='left'/>
==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology, [[Avonmouth RRC]] has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility will processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/ Viridor Website]</ref>
An [[EfW]] facility based upon conventional [[combustion]] technology, [[Avonmouth RRC]] has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility will processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/ Viridor Website]</ref>
Line 13: Line 12:
The plant is assumed to be similar to [[Viridor]]'s [[Ardley EfW]], comprising 2 lines of 20 tonnes/hour design capacity capable of treating 300,000 tonnes per annum via standard [[combustion]] technology Martin Reverse Acting [[Grate]], generating super-heated steam, configured to run on primarily residual [[Household Waste]].
The plant is assumed to be similar to [[Viridor]]'s [[Ardley EfW]], comprising 2 lines of 20 tonnes/hour design capacity capable of treating 300,000 tonnes per annum via standard [[combustion]] technology Martin Reverse Acting [[Grate]], generating super-heated steam, configured to run on primarily residual [[Household Waste]].


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}


{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />

Latest revision as of 19:21, 18 June 2021

An EfW facility based upon conventional combustion technology, Avonmouth RRC has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility will processes primarily residual Household Waste and some Commercial Waste[1]


Severn Road Resource Recovery Centre
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence SP3301LA
Operator Viridor
Region South West
Operational Capacity 377ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.79
Electrical Capacity 34.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2020 62242.00 5560.00 0.00 0.00 67802.00
2021 224024.00 61194.00 0.00 0.00 285218.00
2022 285872.00 77959.00 0.00 0.00 363831.00
2023 115810.00 274720.00 0.00 0.00 390530.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2020 13125.00 19.36% 3018.00 4.45%
2021 54483.00 19.10% 6375.00 2.24%
2022 73948.00 20.32% 7135.00 1.96%
2023 80372.00 20.58% 735.00 0.19%

Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved
Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved


Summary

An EfW facility based upon conventional combustion technology, Avonmouth RRC has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility will processes primarily residual Household Waste and some Commercial Waste[2]

History

The Avonmouth RRC facility started construction in summer 2017 and has secured tonnage from Somerset Waste Partnership through the extension of their existing PPP of around 100,000 tonnes per annum and secured[3] tonnage through competitive tender for Residual Waste from the West of England Partnership, replacing the existing PPP contract with New Earth Solutions/Panda MBT plant. The balance of the West of England Partnership Residual Waste tonnage for EfW of 50,000 tonnes per annum has been secured by Suez facility at its Riverside Resource Recovery Facility (RRRF), located close to the Avonmouth RRC facility.

Plant

The plant was built by a JV between CNIM and Clugson (although Clugson went into administration in December 2019[4]) and the plant was handed over by CNIM to Viridor in December 2020[5] under a Design & Build EPC-turnkey contract at a cost of £252m. The plant is assumed to be similar to Viridor's Ardley EfW, comprising 2 lines of 20 tonnes/hour design capacity capable of treating 300,000 tonnes per annum via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, configured to run on primarily residual Household Waste.

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage


Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit SP3301LA, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: 433,335.84t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
19 12 04 Gloucester 40.22
19 12 04 North Northamptonshire 376.00
19 12 12 Torfaen 156.82
18 01 04 Cardiff 4.72
19 12 12 Bristol, City of 109992.11
19 12 04 Norwich 189.28
19 12 12 Wiltshire 7436.64
19 12 04 Leeds 152.42
19 12 12 Swansea 923.12
19 12 12 Gloucester 59235.28
19 12 04 Amber Valley 19.04
20 03 01 Somerset 446.36
20 03 01 Exeter 582.38
18 01 04 Hampshire 287.36
20 03 01 Derbyshire 1108.46
19 12 04 Flintshire 30.86
20 03 01 Herefordshire, The County of 676.82
19 12 12 Cornwall 608.42
19 12 12 Blaenau Gwent 123.26
19 12 12 Newport 1821.62
19 12 04 Mole Valley 714.34
19 12 04 West Berkshire 14.60
19 12 04 Bristol, City of 1938.54
19 12 04 Manchester 372.50
20 03 01 Gloucester 24.42
19 12 12 Pembrokeshire 25.36
19 12 04 Milton Keynes 7.46
20 01 08 Bristol, City of 9.36
19 12 04 Birmingham 54.58
19 12 04 Bedford 47.60
19 12 04 Nottinghamshire 227.08
19 12 04 Cheltenham 531.94
19 12 04 Medway 27808.87
18 01 04 Bristol, City of 3058.98
20 03 01 Bristol, City of 13087.28
19 12 04 Slough 1202.16
19 12 04 Northumberland 216.88
19 12 04 Greater London 17.40
19 12 04 Gedling 66.08
19 12 12 Rhondda Cynon Taf 156.66
19 12 04 Leicestershire 365.28
19 12 04 South Ribble 1543.64
19 12 04 Havering 142.10
19 12 04 Buckinghamshire 81.60
19 12 04 Coventry 262.20
20 03 01 Devon 3346.12
19 12 04 Tewkesbury 59.66
18 01 04 Torfaen 0.76
20 03 01 Birmingham 168.70
19 12 12 Neath Port Talbot 1200.94
18 01 04 Devon 1024.84
19 12 12 Hertfordshire 6267.74
20 03 01 Swindon 36908.76
19 12 12 Bath and North East Somerset 2805.20
19 12 04 Lincolnshire 1067.46
19 12 12 Somerset 103175.41
19 12 12 North Somerset 34942.82
19 12 04 Cumbria 18.04
19 12 04 Reading 55.32
18 01 04 Exeter 714.76
20 03 01 North Somerset 52.16
19 12 04 Outside UK 2718.85
19 12 12 Swindon 156.70
19 12 04 Bexley 2463.50


References