Energy Works (Hull): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m minor text change
Line 1: Line 1:
{{#vardefine:epr|NP3837NV}}[Category:EfW Plants]]
{{#vardefine:epr|NP3837NV}}[[Category:EfW Plants]]
An [[EfW]] facility based upon [[Gasification]] technology and presently in advanced construction/commissioning. Energy Works has forecast operational capacity of 240,000 tonnes per annum, and is being developed by [[Bioenergy Investment Group]]. {{EfWTemplate|EPR={{#var:epr}}|id=54}}[[File:Hull Energy Works.png|350px|left|Energy Works (HULL)]]__TOC__<br clear='left' />
An [[EfW]] facility based upon [[Gasification]] technology and presently in advanced construction/commissioning. Energy Works has forecast operational capacity of 240,000 tonnes per annum, and is being developed by [[Bioenergy Investment Group]]. {{EfWTemplate|EPR={{#var:epr}}|id=54}}[[File:Hull Energy Works.png|350px|left|Energy Works (HULL)]]__TOC__<br clear='left' />


Line 6: Line 6:


==Technology==
==Technology==
The plant is a single line, [[fluidised bed]] [[Gasification]] plant by [[Outotec]], generating super-heated steam.
The plant is a single line, [[Fluidised Bed|fluidised bed]] [[Gasification]] plant by [[Outotec]], generating super-heated steam.


==Construction==
==Construction==