Energy Works (Hull): Difference between revisions
Arctellion (talk | contribs) No edit summary |
m minor text change |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr|NP3837NV}}[Category:EfW Plants]] | {{#vardefine:epr|NP3837NV}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon [[Gasification]] technology and presently in advanced construction/commissioning. Energy Works has forecast operational capacity of 240,000 tonnes per annum, and is being developed by [[Bioenergy Investment Group]]. {{EfWTemplate|EPR={{#var:epr}}|id=54}}[[File:Hull Energy Works.png|350px|left|Energy Works (HULL)]]__TOC__<br clear='left' /> | An [[EfW]] facility based upon [[Gasification]] technology and presently in advanced construction/commissioning. Energy Works has forecast operational capacity of 240,000 tonnes per annum, and is being developed by [[Bioenergy Investment Group]]. {{EfWTemplate|EPR={{#var:epr}}|id=54}}[[File:Hull Energy Works.png|350px|left|Energy Works (HULL)]]__TOC__<br clear='left' /> | ||
| Line 6: | Line 6: | ||
==Technology== | ==Technology== | ||
The plant is a single line, [[fluidised bed]] [[Gasification]] plant by [[Outotec]], generating super-heated steam. | The plant is a single line, [[Fluidised Bed|fluidised bed]] [[Gasification]] plant by [[Outotec]], generating super-heated steam. | ||
==Construction== | ==Construction== | ||