Swindon Energy Plant: Difference between revisions
Imported from text file |
Arctellion (talk | contribs) No edit summary |
||
| (4 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine:epr|Tbc18}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility originally based upon [[Gasification]] technology. Consented on [[Crapper and Sons]] [[Landfill]] site in Wootton Basset, as part of a number of other facilities including a [[Biomass]] project from [[Waste Wood]] and a [[Mechanical Treatment]] process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the [[EfW]] facility to date. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=65}}__TOC__<br clear='left'/> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility originally based upon [[Gasification]] technology. Consented on [[Crapper and Sons]] [[Landfill]] site in Wootton Basset, as part of a number of other facilities including a [[Biomass]] project from [[Waste Wood]] and a [[Mechanical Treatment]] process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the [[EfW]] facility to date. | |||
== | ==Technology== | ||
The plant was originally designed based on modular [[Gasification]] technology. | |||
== | ==Construction== | ||
There is no information on the current status of funding or construction of the project in the public domain, the company website notes that planning is in place in 2016 but has no other detail<ref>[https://www.crapperandsons.co.uk/renewable-energy-plant/ Crapper and Sons Website]</ref>. | |||
== | ==Waste Input== | ||
The plant was designed to run on 70,000 tonnes per annum of prepared [[RDF]] from an adjacent [[Mechanical Treatment]] facility. | |||
==References== | ==References== | ||
<references /> | <references /> | ||