Showground Road: Difference between revisions
m minor text change |
Arctellion (talk | contribs) No edit summary |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:EfW Plants]] | {{#vardefine:epr|UP3708SB}} | ||
{{EfWTemplate|EPR= | |||
[[File:1615908114673.jpg|350px|left|Showground Road in Construction March 2021 - Image from STC all rights reserved]]__TOC__ | [[Category:EfW Plants]]An [[EfW]] facility based upon standard [[combustion]] technology. The Showground Road site is being delivered by a joint venture between [[Equitix]] and [[Iona Capital]] known as [[Bridgwater Resource Recovery Limited]]. | ||
<br clear='left'/> | {{EfWTemplate|EPR={{#var:epr}}|id=62}} | ||
[[File:1615908114673.jpg|350px|left|Showground Road in Construction March 2021 - Image from STC all rights reserved]]__TOC__<br clear='left'/> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon standard [[combustion]] technology. The Showground Road site is being delivered by a joint venture between [[Equitix]] and [[Iona Capital]] known as [[Bridgwater Resource Recovery Limited]]. | An [[EfW]] facility based upon standard [[combustion]] technology. The Showground Road site is being delivered by a joint venture between [[Equitix]] and [[Iona Capital]] known as [[Bridgwater Resource Recovery Limited]]. | ||
==Technology== | ==Technology== | ||
The plant is a 1 line, moving [[grate]] based technology by [[Kablitz]], generating steam via a [[Comef]] boiler, to turbines delivering 7.75MWe. | The plant is a 1 line, moving [[grate]] based technology by [[Kablitz]], generating steam via a [[Comef]] boiler, to turbines delivering 7.75MWe. |
Latest revision as of 13:28, 23 August 2021
An EfW facility based upon standard combustion technology. The Showground Road site is being delivered by a joint venture between Equitix and Iona Capital known as Bridgwater Resource Recovery Limited.
Showground Road Under Construction | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | UP3708SB |
Operator | Bridgwater Resource Recovery |
Region | South West |
Operational Capacity | 105ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 7.80MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | No |
Technology Approach | EfW |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon standard combustion technology. The Showground Road site is being delivered by a joint venture between Equitix and Iona Capital known as Bridgwater Resource Recovery Limited.
Technology
The plant is a 1 line, moving grate based technology by Kablitz, generating steam via a Comef boiler, to turbines delivering 7.75MWe.
Construction
The plant is being constructed under a turnkey EPC arrangement at a capital cost of GBP £72m by STC Power SRL and will be operated and maintained by Pinacle Power Limited, with operations due to commence in late 2021.
Waste Input
The plant is designed to run on 100,000 tonnes per year of prepared RDF under an exclusive supply/aggregation arrangement with Geminor[1].