Incineration with Energy Recovery: Difference between revisions
m →Use in WasteDataFlow: Reference link |
m update links |
||
| (6 intermediate revisions by 3 users not shown) | |||
| Line 9: | Line 9: | ||
If an [[Incineration]] facility can be shown to meet the energy efficiency measurement of [[R1]] it can be classified as a [[recovery]] facility, if it cannot it is classified as a [[disposal]] facility<ref>https://data.gov.uk/dataset/8287c81b-2288-4f14-9068-52bfda396402/r1-status-of-incinerators-in-england</ref>. This means that an incinerator that generates power, and is a net exporter of power, can be described as an [[Energy from Waste]]([[EfW]]) facility. An incinerator that is an [[EfW]] facility that meets the [[R1]] criteria is the only type of incinerator under the legislation that can legitimately describe itself as an '''[[Energy Recovery Facility]]''' ([[ERF]]). | If an [[Incineration]] facility can be shown to meet the energy efficiency measurement of [[R1]] it can be classified as a [[recovery]] facility, if it cannot it is classified as a [[disposal]] facility<ref>https://data.gov.uk/dataset/8287c81b-2288-4f14-9068-52bfda396402/r1-status-of-incinerators-in-england</ref>. This means that an incinerator that generates power, and is a net exporter of power, can be described as an [[Energy from Waste]]([[EfW]]) facility. An incinerator that is an [[EfW]] facility that meets the [[R1]] criteria is the only type of incinerator under the legislation that can legitimately describe itself as an '''[[Energy Recovery Facility]]''' ([[ERF]]). | ||
The most recent recent [[BAT|BREF]] guidance<ref name="Inc">[https://ec.europa.eu/ | The most recent recent [[BAT|BREF]] guidance<ref name="Inc">[https://eippcb.jrc.ec.europa.eu/sites/default/files/2020-01/JRC118637_WI_Bref_2019_published_0.pdf BAT and BREF for Waste incineration]</ref> also sets out how incinerators can be described by: | ||
* waste origin (e.g. Municipal Incinerators), '''and in WikiWaste includes [[Residual Waste EFW]] and [[Biomass Waste EFW]]''', | * waste origin (e.g. Municipal Incinerators), '''and in WikiWaste includes [[Residual Waste EFW]] and [[Biomass Waste EFW]]''', | ||
* the nature of the waste (e.g. Hazardous Waste Incinerators), | * the nature of the waste (e.g. Hazardous Waste Incinerators), | ||
* the method/type of incineration (e.g. High Temperature Incinerators) | * the method/type of incineration (e.g. High Temperature Incinerators) | ||
However, there are a range of other terms used in the sector to describe different types of incineration, the kiln/furnace used, and the [[subsidy]] that may apply to them, and these are captured in the table below: | In WikiWaste these last two bullet points are covered in '''[[High Temperature and Clinical Waste Incineration]]'''. | ||
However, there are a range of other terms used in the sector to describe different types of [[Incineration|incineration]], the kiln/furnace used, and the [[subsidy]] that may apply to them, and these are captured in the table below: | |||
{|class="wikitable" | {|class="wikitable" | ||
| Line 23: | Line 25: | ||
|[[Fluidised Bed]] | |[[Fluidised Bed]] | ||
|- | |- | ||
|rowspan=2|[[Gasification]]||rowspan=2|500 - 1600||rowspan=2| [[Advanced Thermal Treatment]] ([[ATT]] and [[ACT]])||[[Rotary]] | |rowspan=2|[[Gasification]]||rowspan=2|500 - 1600||rowspan=2| [[Advanced Thermal Treatment]] ([[ATT]] and [[ACT]])||[[Rotary Kiln]] | ||
|- | |- | ||
|rowspan=3|[[Incineration without Energy Recovery|Without Energy Recovery]]||[[Plasma]] | |rowspan=3|[[Incineration without Energy Recovery|Without Energy Recovery]]||[[Plasma]] | ||
| Line 31: | Line 33: | ||
|[[Surface contact]] | |[[Surface contact]] | ||
|} | |} | ||
==UK Macro Data== | ==UK Macro Data== | ||
[[Waste Facilities in UK]] provides an indication on the numbers of [[incineration]] facilities that are considered [[Energy Recovery Facility|Energy Recovery Facilities]] operating within the UK. Those [[EfW]] facilities that presently have an [[R1]] status are listed on the [[R1]] page as [[Energy Recovery Facility|Energy Recovery Facilities]]. | [[Waste Facilities in UK]] provides an indication on the numbers of [[incineration]] facilities that are considered [[Energy Recovery Facility|Energy Recovery Facilities]] operating within the UK. Those [[EfW]] facilities that presently have an [[R1]] status are listed on the [[R1]] page as [[Energy Recovery Facility|Energy Recovery Facilities]]. | ||
Older [[incineration]] facilities, [[Clinical Waste Incineration]] and [[Hazardous Waste Incineration]] generally do not meet [[R1]], are therefore generally considered [[disposal]] facilities, and are generally registered in [[WasteDataFlow]] as [[Incineration without Energy Recovery]]. | Older [[incineration]] facilities, [[Clinical Waste Incinerator|Clinical Waste Incineration]] and [[Hazardous Waste Incineration]] generally do not meet [[R1]], are therefore generally considered [[disposal]] facilities, and are generally registered in [[WasteDataFlow]] as [[Incineration without Energy Recovery]]. | ||
==References== | ==References== | ||