Lean Quarry Landfill Site: Difference between revisions

Bin52 (talk | contribs)
m minor text change
Bin52 (talk | contribs)
m change template
 
Line 20: Line 20:
Elsewhere within the quarry complex, Viridor also developed a [[Materials Recovery Facility]] to deal with locally derived recyclable waste streams. This facility was covered by the same planning consent as the landfill.
Elsewhere within the quarry complex, Viridor also developed a [[Materials Recovery Facility]] to deal with locally derived recyclable waste streams. This facility was covered by the same planning consent as the landfill.


==Tonnage Handled==
Only Waste Codes receiving over 5,000t are shown.
{{NHLFTable|Permit=BV2204IZ}}
{{NHLFTable|Permit=BV2204IZ}}


==References==
==References==