[[File:Hoddesdon.png|280px|left|Picture of Hoddesdon EFW Site (Rattys Lane)]]
{{#vardefine:epr|UP3038WA}}[[Category:EfW Plants]]An [[EfW]] facility based upon [[Gasification]] technology. The Ratty's Lane site (also known as Hoddesdon Energy), was originally developed by [[AssetGen Partners]], with investment from [[Noy Fund]], [[P3P Partners]] and [[Bioenergy Investment Group]]. It was reported in January 2022 that it was to be 'placed in preservation from March 2022' due to a failure to perform to design<ref>https://www.endswasteandbioenergy.com/article/1738732/hoddesdon-shut-waste-gasification-plant-fails</ref>
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=UP3038WA|id=64}}[[File:Hoddesdon.png|280px|left|Picture of Hoddesdon EFW Site (Rattys Lane)]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=Tbc#17|id=64}}


==Summary==
==Summary==
Line 7: Line 6:


==Technology==
==Technology==
The plant is understood to be a 3 line, grate based technology by [[Biomass Power Limited]], generating steam to turbines delivering 10MWe.  
The plant is understood to be a 3 line, [[grate]] based technology by [[Biomass Power Limited]], generating steam to turbines delivering 10MWe.  


==Construction==
==Construction==
The plant is being constructed under a turnkey [[EPC]] arrangement at a capital cost of GBP £60m by [[Bouygues Energy Services]] who will also operate and maintain the plant for 10 years. Whilst testing was reported to have commenced in January 2018, no report of final commissioning has been published<ref>[https://www.letsrecycle.com/news/latest-news/testing-starts-hoddesdon-gasification-plant/ Letsrecycle Article]</ref>.
The plant is being constructed under a turnkey [[EPC]] arrangement at a capital cost of GBP £60m by [[Bouygues Energy Services]] who will also operate and maintain the plant for 10 years. Whilst testing was reported to have commenced in January 2018<ref>[https://www.letsrecycle.com/news/latest-news/testing-starts-hoddesdon-gasification-plant/ Letsrecycle Article]</ref>, the [[Bioenergy Investment Group]] currently suggests the plant is operational, with take over certificate granted in 2020 and performance testing in process<ref>https://bioenergyinfrastructure.co.uk/site/hoddesdon-energy/</ref>.


==Waste Input==
==Waste Input==