Eye Power Station: Difference between revisions
No edit summary |
add templates |
||
| Line 10: | Line 10: | ||
Built and commissioned in 1992, the plant was converted with assistance from [[K.E.M]] in 2017 to add fuel flexibility to enable it to receive [[Wood Waste]]. The conversion comprised fuel feeding, combustion grate system and slag transport system - the boiler supplies 58tonnes/hour of steam at 66 bar(g) and 450<sup>o</sup> to a steam turbine for power production<ref>[https://www.kem.dk/cases/eye-power-station-uk/ KEM Website]</ref>. | Built and commissioned in 1992, the plant was converted with assistance from [[K.E.M]] in 2017 to add fuel flexibility to enable it to receive [[Wood Waste]]. The conversion comprised fuel feeding, combustion grate system and slag transport system - the boiler supplies 58tonnes/hour of steam at 66 bar(g) and 450<sup>o</sup> to a steam turbine for power production<ref>[https://www.kem.dk/cases/eye-power-station-uk/ KEM Website]</ref>. | ||
= | {{BioSustain|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
{| | |||
==References== | ==References== | ||
<references /> | <references /> | ||