A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|1448}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|1448}} | ||
{{BiomassPlant|NAME=BSW Timber|id=17|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=BSW Timber|id=17|EPR={{#var: epr}}}} | ||
Line 6: | Line 7: | ||
==Summary== | ==Summary== | ||
A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility | A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices<ref name="ref1" >BSW Timber, 2016. [https://www.bsw.co.uk/news/articles/244/bsw-timber-fires-up-2.5m-biomass-boiler-at-carlisle-sawmill BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020]].</ref>. | ||
This facility was developed in partnership with [[Dallol Energy]]<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020]].</ref>. | This facility was developed in partnership with [[Dallol Energy]]<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020]].</ref>. | ||
Line 13: | Line 14: | ||
The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia<ref name="ref1" />. | The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia<ref name="ref1" />. | ||
== | {{BioSustain|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references/> | <references/> |
Latest revision as of 07:02, 15 August 2022
A Biomass Waste combined heat and power (CHP) EFW facility BSW Timber utilises Wood Waste to generate 3.2 MW. The facility is located at the BSW sawmill in Carlisle.
BSW Timber Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | BSW Timber |
Capacity | 3.2 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | 1448 |
ROC | No |
CfD | |
CHP | Yes |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste combined heat and power (CHP) EFW facility BSW Timber utilises Wood Waste to generate 3.2 MW. The facility is located at the BSW sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices[2].
This facility was developed in partnership with Dallol Energy[2], and became operational in 2016[3].
Plant
The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia[2].
Annual Sustainability Tonnage Input/Fuel
The tonnage[4] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[5]:
Year | Waste Wood (m3) | Waste Wood (t) | Straw | Miscanthus | Arboricultrual Waste | Sawmill Residue | Foresrty Residue | Round Wood | Short Rotation Coppice | MBM | Other Material |
---|---|---|---|---|---|---|---|---|---|---|---|
2020/21 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2019/20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2018/19 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2017/18 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='1448' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected
Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='1448' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit 1448, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|
References
- ↑ BSW Timber Biomass Site PhotoAll Rights Reserved
- ↑ 2.0 2.1 2.2 BSW Timber, 2016. BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020].
- ↑ Les Prom, 2016. BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020].
- ↑ In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
- ↑ Biomass Sustainability Dataset 2020-21