Chilton Power Station: Difference between revisions
add templates |
No edit summary |
||
| Line 1: | Line 1: | ||
A [[Biomass Waste EFW]] facility [[Chilton Power Station]] utilises a feedstock of up to 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|BP3736HA}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|BP3736HA}} | ||
{{BiomassPlant|NAME=Chilton Power Station|id=20|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Chilton Power Station|id=20|EPR={{#var: epr}}}} | ||
| Line 5: | Line 7: | ||
==Summary== | ==Summary== | ||
A Biomass Waste EFW facility | A [[Biomass Waste EFW]] facility [[Chilton Power Station]] utilises a feedstock of up to 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. | ||
The facility has been developed, built and continues to be operated by [[ | The facility has been developed, built and continues to be operated by [[Veolia Bio Energy Ltd]], previously known as [[Dalkia Bio Energy Ltd]]. Construction started in early 2010 and it became operational in 2011<ref name="ref1 />. | ||
==Plant== | ==Plant== | ||