[[File:Pic of Trackwork site.png|400px|left|Picture of Trackwork Biomass EFW site, source Google Streetview]]
A [[Biomass Waste EFW]] facility [[Trackwork Waste and Thermal Treatment Facility]] is permitted to incinerate up to 35,000 tonnes per annum of [[Wood Waste]] generating 3.0MWe to the grid.
{{BiomassPlant|NAME=Trackwork Ltd|id=83}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|MP3030BY}}
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Trackwork Waste and Thermal Treatment Facility|id=83|EPR={{#var: epr}}}}
[[File:Pic of Trackwork site.png|400px|left|Picture of Trackwork Biomass EFW site, source Google Streetview]]__TOC__
<br clear='left'/>


==Summary==
A [[Biomass Waste EFW]] facility [[Trackwork Waste and Thermal Treatment Facility]] is permitted to incinerate up to 35,000 tonnes per annum of [[Wood Waste]] generating 3.0MWe to the grid.


The Trackwork site was developed by [[Trackwork Ltd]] to process used railway sleepers from the rail network. Due to the hazardous nature of this particular material, the site is permitted as a hazardous waste incinerator. The permit was consolidated with an adjacent transfer station and processing site in November 2010, the consolidated permit allows up to 12,500 tonnes per year on non-hazardous and 42,000 tonnes per year of material to be handled.


==Plant==
The plant was reported as becoming operational in 2010 and was built at a cost of £8m<ref>https://www.ttjonline.com/news/hazardous-wood-waste-plant-throws-the-switch</ref>.


{{BioSustain|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}


 
The plant has expanded to take a wider range of hazardous [[Wood Waste]] beyond the originally intended railway sleepers from [[Network Rail]] including commercial and industrial sources<ref>[http://www.trackwork.co.uk/recycling/hazardous-treated-wood-disposal/ Trackwork Website]</ref>, including the following treated [[Wood Waste]]:  
==Summary==
A [[Biomass Waste EFW]] facility permitted to incinerate up to 35,000 tonnes per annum of [[Wood Waste]] generating 3.0MWe to the grid.
 
The Trackwork site was developed by [[Trackwork Ltd]] to process used railway sleepers and, due to their hazardous nature, the site is permitted as a hazardous waste incinerator. The permit was consolidated with an adjacent transfer station and processing site in November 2010, the consolidated permit allows up to 12,500 tonnes per year on non-hazardous and 42,000 tonnes per year of material to be handled.
 
==Plant==
The plant has expanded to take a wider range of hazardous [[Wood Waste]] beyond the originally intended railway sleepers<ref>[http://www.trackwork.co.uk/recycling/hazardous-treated-wood-disposal/ Trackwork Website]</ref>, including other treated [[Wood Waste]]:  
* Creosote wood waste
* Creosote wood waste
* Copper Chromium Arsenic (CCA) wood waste
* Copper Chromium Arsenic (CCA) wood waste
Line 23: Line 25:
* Utility poles
* Utility poles
* Telegraph poles
* Telegraph poles
==Local Authority Users==
The plant utilizes hazardous [[Wood Waste]] from the rail network and other commercial and industrial sources and receives no local authority wood.


==References==