A [[Biomass Waste EFW]] facility [[Western Wood Energy Plant]] is based upon the co-firing of virgin wood and forestry processing rejects, with only small amounts of clean [[Wood Waste]] to generate 14MWe<ref>[https://www.eco2uk.com/projects/biomass/western-wood-energy-plant/ ECO2 Website: Western wood Plant]</ref>. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|ZP3939GL}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|ZP3939GL}} | ||
{{BiomassPlant|NAME=Western Wood|id=90|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Western Wood Energy Plant|id=90|EPR={{#var: epr}}}} | ||
[[File:Western Wood 3321887 6c8bc9e1.jpg|400px|left|Western Wood Energy Plant - Source Chris Andrews]]__TOC__ | [[File:Western Wood 3321887 6c8bc9e1.jpg|400px|left|Western Wood Energy Plant - Source Chris Andrews]]__TOC__ | ||
<br clear='left'/> | <br clear='left'/> | ||
==Summary== | ==Summary== | ||
A [[Biomass Waste EFW]] facility based upon the co-firing of virgin wood and forestry processing rejects, with only small amounts of clean [[Wood Waste]] to generate 14MWe | A [[Biomass Waste EFW]] facility [[Western Wood Energy Plant]] is based upon the co-firing of virgin wood and forestry processing rejects, with only small amounts of clean [[Wood Waste]] to generate 14MWe. The [[Forestry Commission]] is the largest fuel supplier to the plant. | ||
The Western Wood facility is owned by [[Western Bioenergy Ltd]] and [[Good Energies(UK) LLP]] is the principle shareholder (with a minority interest by [[Western Log Group]] who originally developed the project). [[ECO2]] joined the project between 2004 and 2014 for fuel logistics and administration - the plant is now owned and operated by [[Greensphere Capital LLP]]. | The Western Wood facility is owned by [[Western Bioenergy Ltd]] and [[Good Energies(UK) LLP]] is the principle shareholder (with a minority interest by [[Western Log Group]] who originally developed the project). [[ECO2]] joined the project between 2004 and 2014 for fuel logistics and administration - the plant is now owned and operated by [[Greensphere Capital LLP]]. | ||
Line 12: | Line 13: | ||
The plant commenced construction in October 2006 and was fully operational in November 2008. The plant cost £33m to construct via an [[EPC]] consortium contract between [[Aalborg Energie Technik]] (AET) and [[Burmeister & Wain Scandinavian Contractor]] (BWSC). It is based on coventional combustion via an advanced grate that processes 20 tonnes per hour of wood chips, with a steam turbine from [[Mitsui Engineering & Shipbuilding]]<ref>[https://www.renewable-technology.com/projects/western-wood-energy-biomass-wales/ Renewable Technology Website]</ref>. | The plant commenced construction in October 2006 and was fully operational in November 2008. The plant cost £33m to construct via an [[EPC]] consortium contract between [[Aalborg Energie Technik]] (AET) and [[Burmeister & Wain Scandinavian Contractor]] (BWSC). It is based on coventional combustion via an advanced grate that processes 20 tonnes per hour of wood chips, with a steam turbine from [[Mitsui Engineering & Shipbuilding]]<ref>[https://www.renewable-technology.com/projects/western-wood-energy-biomass-wales/ Renewable Technology Website]</ref>. | ||
= | {{BioSustain|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
{| | |||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 10:56, 15 August 2022
A Biomass Waste EFW facility Western Wood Energy Plant is based upon the co-firing of virgin wood and forestry processing rejects, with only small amounts of clean Wood Waste to generate 14MWe[1].
Western Wood Energy Plant Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Western Bio-Energy Ltd |
Capacity | 16.4 MWe |
Feedstock | Waste Wood/Virgin |
EPR (Waste Licence) | ZP3939GL |
ROC | Yes |
CfD | |
CHP | Unkwn |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|---|---|---|---|---|
2021 | 61769 | 0 | 0 | 64873 | 126642 |
2022 | 25983 | 0 | 0 | 0 | 101393 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2021 | 4111 | 3.25% | 375 | 0.30% |
2022 | 4863 | 4.80% | 453 | 0.45% |
Summary
A Biomass Waste EFW facility Western Wood Energy Plant is based upon the co-firing of virgin wood and forestry processing rejects, with only small amounts of clean Wood Waste to generate 14MWe. The Forestry Commission is the largest fuel supplier to the plant.
The Western Wood facility is owned by Western Bioenergy Ltd and Good Energies(UK) LLP is the principle shareholder (with a minority interest by Western Log Group who originally developed the project). ECO2 joined the project between 2004 and 2014 for fuel logistics and administration - the plant is now owned and operated by Greensphere Capital LLP.
Plant
The plant commenced construction in October 2006 and was fully operational in November 2008. The plant cost £33m to construct via an EPC consortium contract between Aalborg Energie Technik (AET) and Burmeister & Wain Scandinavian Contractor (BWSC). It is based on coventional combustion via an advanced grate that processes 20 tonnes per hour of wood chips, with a steam turbine from Mitsui Engineering & Shipbuilding[2].
Annual Sustainability Tonnage Input/Fuel
The tonnage[3] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for Error: no local variable "asyear" has been set. was reported by Ofgem as below[4]:
Year | Waste Wood (m3) | Waste Wood (t) | Straw | Miscanthus | Arboricultrual Waste | Sawmill Residue | Foresrty Residue | Round Wood | Short Rotation Coppice | MBM | Other Material |
---|
The query SELECT "ewc","origin","tin" FROM "db_ea"."ea_ew_in" WHERE epr='ZP3939GL' is invalid (Error : SSL SYSCALL error: EOF detected
Function: EDConnectorRdbms::fetch Query: SELECT "ewc","origin","tin" FROM "db_ea"."ea_ew_in" WHERE epr='ZP3939GL' ).
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit ZP3939GL, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|
References
- ↑ ECO2 Website: Western wood Plant
- ↑ Renewable Technology Website
- ↑ In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
- ↑ Biomass Sustainability Dataset 2020-21