A [[Biomass EfW]] facility [[Thetford Power Station]] runs primarily on [[Poultry Litter]], [[MBM]] and [[Virgin Wood]] this 38.5MW plant has been operated by [[MRE]]/[[EPR Thetford Ltd]] since 1999.<ref>https://www.mreuk.com/thetford</ref>
[[Category:Biomass EfW Plants]]{{#vardefine: epr|PP3235LP}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|PP3235LP}}
{{BiomassPlant|NAME=Thetford Power Station|id=5|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Thetford Power Station|id=5|EPR={{#var: epr}}}}
Line 5: Line 6:


==Summary==
==Summary==
to add
A [[Biomass EfW]] facility [[Thetford Power Station]] runs primarily on [[Poultry Litter]], [[MBM]] and [[Virgin Wood]] this 38.5MW plant has been operated by [[MRE]]/[[EPR Thetford Ltd]] since 1999.


==Plant==
==Plant==
to add
The plant's first power was generated in June 1999, with [[Taylor Woodrow Management and Engineering]] carrying out the design and construction turnkey package at a cost of £69m. The Fuel handling was by [[Birtley Engineering plc]], the ''roto grate''<ref>Annual Report 2021</ref> ([[Grate]]) by [[Detroit Stoker Inc.]], the [[boiler]] by [[Foster Wheeler Ltd]] (Canada) and the turbine by [[Ansaldo Energia SpA]]<ref>http://www.engineering-timelines.com/scripts/engineeringItem.asp?id=992</ref>


{{BioSustain|EPR={{#var: epr}}}}
{{BioSustain|EPR={{#var: epr}}}}

Latest revision as of 15:19, 22 August 2022

A Biomass EfW facility Thetford Power Station runs primarily on Poultry Litter, MBM and Virgin Wood this 38.5MW plant has been operated by MRE/EPR Thetford Ltd since 1999.[1]


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 38274 422583 0 0 460857
2019 43461 449655 0 0 493116
2020 59713 431356 0 5922 496992
2021 51881 390383 0 55589 497853
2022 62297 337561 0 61623 461481


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 8782 1.91% 1337 0.29%
2019 7994 1.62% 686 0.14%
2020 7995 1.61% 686 0.14%
2021 10951 2.20% 13339 2.68%

Thetford Power Station - geograph.org.uk - 422118
Thetford Power Station - geograph.org.uk - 422118


Summary

A Biomass EfW facility Thetford Power Station runs primarily on Poultry Litter, MBM and Virgin Wood this 38.5MW plant has been operated by MRE/EPR Thetford Ltd since 1999.

Plant

The plant's first power was generated in June 1999, with Taylor Woodrow Management and Engineering carrying out the design and construction turnkey package at a cost of £69m. The Fuel handling was by Birtley Engineering plc, the roto grate[2] (Grate) by Detroit Stoker Inc., the boiler by Foster Wheeler Ltd (Canada) and the turbine by Ansaldo Energia SpA[3]

Annual Sustainability Tonnage Input/Fuel

The tonnage[4] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[5]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 0 0 0 35940 0 21568 0 0 5921 428699
2019/20 0 0 0 0 31857 0 18211 0 0 0 459437
2018/19 0 0 0 0 25965 0 11076 0 0 0 413527
2017/18 0 0 0 0 0 0 0 0 0 0 0

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='PP3235LP' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='PP3235LP' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit PP3235LP, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. https://www.mreuk.com/thetford
  2. Annual Report 2021
  3. http://www.engineering-timelines.com/scripts/engineeringItem.asp?id=992
  4. In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
  5. Biomass Sustainability Dataset 2020-21