Tyrone Energy: Difference between revisions
No edit summary |
|||
Line 8: | Line 8: | ||
A [[Biomass Waste EFW]] facility [[Tyrone Energy]] is based on processing up to 25,000 tonnes per annum of [[Wood Waste]] generating 2.7MWe to the grid. | A [[Biomass Waste EFW]] facility [[Tyrone Energy]] is based on processing up to 25,000 tonnes per annum of [[Wood Waste]] generating 2.7MWe to the grid. | ||
The Tyrone site was developed by [[Tyrone Energy Ltd]] and was operational in late 2014 and at the time was the first large scale [[EfW]] plant in Northern Ireland. It is located near Strabane, County Tyrone<ref>[https://www.tyroneenergy.com/ Tyrone Energy Website]</ref>. | The Tyrone site was developed by [[Tyrone Energy Ltd]] and was operational in late 2014 and at the time was the first large scale [[EfW]] plant in Northern Ireland. It is located near Strabane, County Tyrone<ref>[https://www.tyroneenergy.com/ Tyrone Energy Website]</ref>. It was reported in September 2022 that the business was acquired by [[Beauparc]]<ref>https://beauparc.ie/beauparc-acquire-biomass-power-station-tyrone-energy/</ref>. | ||
==Plant== | ==Plant== |