Riverside Resource Recovery Facility (RRRF): Difference between revisions

Bin52 (talk | contribs)
mNo edit summary
Bin52 (talk | contribs)
 
Line 7: Line 7:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Riverside Resource Recovery Facility (RRRF)]] has permitted operational capacity of 850,000 tonnes per annum, operated by [[Cory Riverside Energy]]. Delivery of waste is primarily by barge on the River Thames, with some tonnage by road, and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.coryenergy.com/about-us/our-history/ Cory Website]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Riverside Resource Recovery Facility (RRRF)]] has permitted operational capacity of 850,000 tonnes per annum (increased from 780,000 tonnes per annum in August 2022), operated by [[Cory Riverside Energy]]. Delivery of waste is primarily by barge on the River Thames, with some tonnage by road, and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.coryenergy.com/about-us/our-history/ Cory Website]</ref>.


==History==
==History==