Riverside Resource Recovery Facility (RRRF): Difference between revisions
mNo edit summary |
|||
Line 7: | Line 7: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Riverside Resource Recovery Facility (RRRF)]] has permitted operational capacity of 850,000 tonnes per annum, operated by [[Cory Riverside Energy]]. Delivery of waste is primarily by barge on the River Thames, with some tonnage by road, and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.coryenergy.com/about-us/our-history/ Cory Website]</ref>. | An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Riverside Resource Recovery Facility (RRRF)]] has permitted operational capacity of 850,000 tonnes per annum (increased from 780,000 tonnes per annum in August 2022), operated by [[Cory Riverside Energy]]. Delivery of waste is primarily by barge on the River Thames, with some tonnage by road, and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.coryenergy.com/about-us/our-history/ Cory Website]</ref>. | ||
==History== | ==History== |