Parc Adfer EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
mNo edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|AB3092CV}}[[Category:EfW Plants]] | ||
The Parc Adfer Energy from Waste facility was developed by and is operated by [[Wheelabrator]], located at the Deeside Industrial Park in Flintshire, North Wales. The facility accepts 200,000 tonnes per year of residual waste as a feedstock from household, business and commercial sources, and produces both electricity and heat through a combustion system as a [[CHP]] plant. The waste feedstock is locally supplied by the 5 counties in the North of Wales representing the [[North Wales Residual Waste Treatment Project]]<ref name= "ref1"> Wheelabrator, 2020. [https://wtiparcadfer.co.uk/about-us/ About - Parc Adfer. Online. Wheelabrator Parc Adfer. [Accessed 6 Feb. 2020]]</ref>.{{EfWTemplate|EPR={{#var: epr}}|id=55}}[[File:Parc Adfer EfW.jpg|400px|left|Parc Adfer EfW. Wheelabrator, 2020.]]__TOC__<br clear='left' /> | The Parc Adfer Energy from Waste facility was developed by and is operated by [[Wheelabrator]], located at the Deeside Industrial Park in Flintshire, North Wales. The facility accepts 200,000 tonnes per year (although an application has been made to extend the permit to 232,000 tonnes) of residual waste as a feedstock from household, business and commercial sources, and produces both electricity and heat through a combustion system as a [[CHP]] plant. The waste feedstock is locally supplied by the 5 counties in the North of Wales representing the [[North Wales Residual Waste Treatment Project]]<ref name= "ref1"> Wheelabrator, 2020. [https://wtiparcadfer.co.uk/about-us/ About - Parc Adfer. Online. Wheelabrator Parc Adfer. [Accessed 6 Feb. 2020]]</ref>.{{EfWTemplate|EPR={{#var: epr}}|id=55}}[[File:Parc Adfer EfW.jpg|400px|left|Parc Adfer EfW. Wheelabrator, 2020.]]__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== | ||