Ince Biomass Power Plant: Difference between revisions
Arctellion (talk | contribs) No edit summary |
mNo edit summary |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | A [[Biomass EfW]] facility, [[Ince Biomass Power Plant]] is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to [[nPower]] under a long-term [[Power Purchase Agreement]]. The facility is located at Protos in Cheshire, and forms part of [[Peel Environmental]]’s ‘[[Protos]]’ energy hub located near Ellesmere Port<ref name="ref2" >Lets Recycle, 2019. [https://www.letsrecycle.com/news/latest-news/cheshire-waste-wood-gasification-facility-fully-operational/ Cheshire Waste Wood Gasification Facility ‘Fully Operational’ - Letsrecycle.com. Online.[Accessed 3 April 2020].]</ref>. | ||
{{BiomassPlant|NAME=Ince | [[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3803PN}} | ||
[[File:Ince Bio Power.jpg|400px|left|Ince Bio Power. CoGen, 2018.]]__TOC__ | {{BiomassPlant|NAME=Ince Biomass Power Plant|id=43|EPR={{#var: epr}}}} | ||
[[File:Ince Bio Power.jpg|400px|left|Ince Bio Power. CoGen, 2018.]]<ref>[https://www.cogenuk.com/projects/ Ince Bio Power Site Photo]All Rights Reserved</ref> | |||
__TOC__ | |||
<br clear='left'/> | <br clear='left'/> | ||
==Summary== | ==Summary== | ||
A [[Biomass EfW]] facility, Ince | A [[Biomass EfW]] facility, [[Ince Biomass Power Plant]] is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to [[nPower]] under a long-term [[Power Purchase Agreement]]. The facility is located at Protos in Cheshire, and forms part of [[Peel Environmental]]’s ‘[[Protos]]’ energy hub located near Ellesmere Port<ref name="ref2" />. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Ince Park Renewables]]<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>. | ||
The | The [[O&M Contract]] for the facility is being carried out by [[Stantec]]<ref name="ref1" />. Construction commenced in 2015 and Ince Bio Power became fully operational in March 2015<ref name="ref2" />. | ||
==Plant== | ==Plant== | ||
Line 14: | Line 16: | ||
The construction and initial operations of the facility were managed by [[CoGen]], and funding was provided by [[Bioenergy Infrastructure Group]]<ref name="ref1" />. | The construction and initial operations of the facility were managed by [[CoGen]], and funding was provided by [[Bioenergy Infrastructure Group]]<ref name="ref1" />. | ||
== | {{BioSustain|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references/> | <references/> |