Ince Biomass Power Plant: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m Bin52 moved page Ince Bio Power to Ince Biomass Power Plant: update database
Bin52 (talk | contribs)
mNo edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
A [[Biomass EfW]] facility, [[Ince Biomass Power Plant]] is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to [[nPower]] under a long-term [[Power Purchase Agreement]]. The facility is located at Protos in Cheshire, and forms part of [[Peel Environmental]]’s ‘[[Protos]]’ energy hub located near Ellesmere Port<ref name="ref2" >Lets Recycle, 2019. [https://www.letsrecycle.com/news/latest-news/cheshire-waste-wood-gasification-facility-fully-operational/ Cheshire Waste Wood Gasification Facility ‘Fully Operational’ - Letsrecycle.com. Online.[Accessed 3 April 2020].]</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3803PN}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3803PN}}
{{BiomassPlant|NAME=Ince Bio Power|id=43|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Ince Biomass Power Plant|id=43|EPR={{#var: epr}}}}
[[File:Ince Bio Power.jpg|400px|left|Ince Bio Power. CoGen, 2018.]]__TOC__
[[File:Ince Bio Power.jpg|400px|left|Ince Bio Power. CoGen, 2018.]]<ref>[https://www.cogenuk.com/projects/ Ince Bio Power Site Photo]All Rights Reserved</ref>
__TOC__
<br clear='left'/>
<br clear='left'/>
<ref>[https://www.cogenuk.com/projects/ Ince Bio Power Site Photo]All Rights Reserved</ref>


==Summary==
==Summary==
A [[Biomass EfW]] facility, Ince Bio Power based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to [[nPower]] under a long-term [[Power Purchase Agreement]]. The facility is located at Protos in Cheshire, and forms part of [[Peel Environmental]]’s ‘[[Protos]]’ energy hub located near Ellesmere Port<ref name="ref2" >Lets Recycle, 2019. [https://www.letsrecycle.com/news/latest-news/cheshire-waste-wood-gasification-facility-fully-operational/ Cheshire Waste Wood Gasification Facility ‘Fully Operational’ - Letsrecycle.com. Online.[Accessed 3 April 2020].]</ref>. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Ince Park Renewables]]<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.
A [[Biomass EfW]] facility, [[Ince Biomass Power Plant]] is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to [[nPower]] under a long-term [[Power Purchase Agreement]]. The facility is located at Protos in Cheshire, and forms part of [[Peel Environmental]]’s ‘[[Protos]]’ energy hub located near Ellesmere Port<ref name="ref2" />. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Ince Park Renewables]]<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.


The operations & maintenance for the facility is being carried out by [[Stantec]]<ref name="ref1" />. Construction commenced in 2015 and Ince Bio Power became fully operational in March 2015<ref name="ref2" />.
The [[O&M Contract]] for the facility is being carried out by [[Stantec]]<ref name="ref1" />. Construction commenced in 2015 and Ince Bio Power became fully operational in March 2015<ref name="ref2" />.


==Plant==
==Plant==
Line 15: Line 16:
The construction and initial operations of the facility were managed by [[CoGen]], and funding was provided by [[Bioenergy Infrastructure Group]]<ref name="ref1" />.
The construction and initial operations of the facility were managed by [[CoGen]], and funding was provided by [[Bioenergy Infrastructure Group]]<ref name="ref1" />.


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant is reported as [[Wood Waste]] in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref>. Because the plant is an [[Advanced Conversion Technology]] and produces a [[Syngas]] the sustainability report talks in terms of the gas input to the energy recovery system, rather than the unprocessed [[Wood Waste]] into the plant, which was 181,876,041 cubic meters.
{{EAIn|EPR={{#var: epr}}}}
The [[Wood Waste]] is exclusively supplied by [[Ince Park Renewables]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''18,650''' tonnes.


==References==
==References==
<references/>
<references/>

Latest revision as of 15:22, 25 May 2023

A Biomass EfW facility, Ince Biomass Power Plant is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to nPower under a long-term Power Purchase Agreement. The facility is located at Protos in Cheshire, and forms part of Peel Environmental’s ‘Protos’ energy hub located near Ellesmere Port[1].


Ince Biomass Power Plant
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Bioenergy Infrastructure Services Ltd
Capacity 22 MWe
Feedstock Waste Wood
EPR (Waste Licence) UP3803PN
ROC Yes
CfD
CHP No

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2019 66166 0 0 0 66166
2020 91750 0 0 0 91750
2021 84254 0 0 0 84254
2022 95007 0 0 0 95007


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2019 1933 2.92% 948 1.43%
2020 1425 1.55% 1055 1.15%
2021 1487 1.76% 1358 1.61%
2022 1269 1.34% 1936 2.04%

Ince Bio Power. CoGen, 2018.
Ince Bio Power. CoGen, 2018.

[2]


Summary

A Biomass EfW facility, Ince Biomass Power Plant is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to nPower under a long-term Power Purchase Agreement. The facility is located at Protos in Cheshire, and forms part of Peel Environmental’s ‘Protos’ energy hub located near Ellesmere Port[1]. The Wood Waste feedstock is sourced locally through a contract with Ince Park Renewables[3].

The O&M Contract for the facility is being carried out by Stantec[3]. Construction commenced in 2015 and Ince Bio Power became fully operational in March 2015[1].

Plant

The facility utilises Outotec’s fluidised bed advanced Gasification technology, which is an Advanced Conversion Technology. The EPC services for the project were provided by a joint venture between MWH Treatment Limited and Black & Veatch Limited[3].

The construction and initial operations of the facility were managed by CoGen, and funding was provided by Bioenergy Infrastructure Group[3].

Annual Sustainability Tonnage Input/Fuel

The tonnage[4] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[5]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 380220289 0 0 0 0 0 0 0 0 0 0
2019/20 277654817 0 0 0 0 0 0 0 0 0 0
2018/19 181876041 0 0 0 0 0 0 0 0 0 0
2017/18 0 0 0 0 0 0 0 0 0 0 0

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit UP3803PN, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. 1.0 1.1 1.2 Lets Recycle, 2019. Cheshire Waste Wood Gasification Facility ‘Fully Operational’ - Letsrecycle.com. Online.[Accessed 3 April 2020.]
  2. Ince Bio Power Site PhotoAll Rights Reserved
  3. 3.0 3.1 3.2 3.3 CoGen, 2018. Projects — Cogen. Online. CoGen. [Accessed 3 April 2020.
  4. In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
  5. Biomass Sustainability Dataset 2020-21