One of the largest [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Scotia Business Park]] will trade under the brand [[Clinitek]] and is referred to as their '''Stoke-on-Trent''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>. | One of the largest [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Scotia Business Park]] will trade under the brand [[Clinitek]] and is referred to as their '''Stoke-on-Trent''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>. | ||
{{ClinIncin|EPR={{#var:epr}}|id=4}}[[File:Stoke EfW 600-304x203.jpg|350px|left|Stoke Clinical Waste Incinerator - all rights reserved Andusia and P3P]]__TOC__ | {{ClinIncin|EPR={{#var:epr}}|id=4}}[[File:Stoke EfW 600-304x203.jpg|350px|left|Stoke Clinical Waste Incinerator - all rights reserved Andusia and P3P]]__TOC__ | ||
| Line 11: | Line 11: | ||
==Plant== | ==Plant== | ||
Construction has commenced and was targeted for completion in Q3 2021 at a reported cost of £25 million<ref name="P3P1" />. The technology provider is [[Incinco]] via their FS2000 treatment unit<ref name="P3P1" /> (2,000kg/hr capacity<ref>[https://irp-cdn.multiscreensite.com/3edaf5b1/files/uploaded/Freestanding%20Incinerator%20500-2000%20Leaflet.pdf Incinco PDF Factsheet]</ref>) with construction oversight by [[Cobalt Energy]]<ref name="P3P1" />. At 8,000 hrs annual operation the maximum annual throughput would be 16,000 tonnes per annum, although the plated capacity has been reported as 12,800 tonnes in the past. The construction was reported as completed in March 2022 with full operation planned by the summer of 2022<ref>https://www.letsrecycle.com/news/construction-complete-at-stoke-clinical-waste-plant/<ref>. | Construction has commenced and was targeted for completion in Q3 2021 at a reported cost of £25 million<ref name="P3P1" />. The technology provider is [[Incinco]] via their FS2000 treatment unit<ref name="P3P1" /> (2,000kg/hr capacity<ref>[https://irp-cdn.multiscreensite.com/3edaf5b1/files/uploaded/Freestanding%20Incinerator%20500-2000%20Leaflet.pdf Incinco PDF Factsheet]</ref>) with construction oversight by [[Cobalt Energy]]<ref name="P3P1" />. At 8,000 hrs annual operation the maximum annual throughput would be 16,000 tonnes per annum, although the plated capacity has been reported as 12,800 tonnes in the past. The construction was reported as completed in March 2022 with full operation planned by the summer of 2022<ref>https://www.letsrecycle.com/news/construction-complete-at-stoke-clinical-waste-plant/</ref>. | ||