Belfast Harbour Estate: Difference between revisions

Imported from text file
 
Bin52 (talk | contribs)
No edit summary
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{#vardefine:epr|P0446/14A}}
{{EfWTemplate|EPR=Tbc#14|id=61}}
[[Category:EfW Plants]]
An [[EfW]] facility based upon [[Gasification]] technology. The Belfast Harbour site, also known as the Bombardier site due to its proximity to this business, is being delivered by a joint venture known as [[Full Circle Generation]] (including [[River Ridge Energy Ltd]], [[Green Investment Bank]], [[Equitix]], and [[P3P Partners]]). The plant is listed as being able to process 120,000 tonnes per year, but is also reported as being capable of processing 180,000 tonnes per year<ref>[https://www.letsrecycle.com/news/latest-news/gib-commits-47m-to-belfast-efw-facility/ Letsrecycle Article]</ref>. {{EfWTemplate|EPR={{#var:epr}}|id=61}}[[File:Belfast.png|400px|left|Artist Impression of Belfast EFW]]__TOC__<br clear='left' />


==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. The Belfast Harbour site, also known as the Bombardier site due to its proximity to this business, is being delivered by a joint venture known as [[Full Circle Generation]] (including [[River Ridge Energy Ltd]], [[Green Investment Bank]], [[Equitix]], and [[P3P Partners]]). The plant is listed as being able to process 120,000 tonnes per year, but is also reported as being capable of processing 180,000 tonnes per year<ref>[https://www.letsrecycle.com/news/latest-news/gib-commits-47m-to-belfast-efw-facility/ Letsrecycle Article]</ref>.


==History==
==Technology==
The plant is a 3 line, [[grate]] based technology by [[Biomass Power Limited]], generating steam to turbines delivering 14.85MWe<ref>[https://riverridge.co.uk/app/uploads/2017/03/FCG.pdf RiverRidge Website/Full Circle Generation Brochure]</ref>.


==Plant==
==Construction==
The plant is being constructed under a turnkey [[EPC]] arrangement at a capital cost of GBP £107m by [[Bouygues Energy Services]] who will also operate and maintain the plant for 17 years<ref>[https://www.theconstructionindex.co.uk/news/view/bouygues-signs-146m-contract-for-belfast-waste-plant The Construction Index Article]</ref>. It is understood that the plant is presently under in an extended testing stage.


==Local Authority Users==
==Waste Input==
The plant is designed to run on 120,000 tonnes per year of prepared [[RDF]] from offsite company [[Pioneer Fuels]].


==References==
==References==
<references />
<references />