Dunbar EfW (Oxwellmains EfW): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
add page specific text
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:Viridor Dunbar.png|290px|left|Viridor Beddington]]
{{#vardefine:epr|PPC/A/1032878}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Dunbar has permitted operational capacity of 300,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/dunbar-erf/ Viridor Website]</ref> mainly in the form of a prepared [[RDF]]{{EfWTemplate|EPR={{#var:epr}}|id=51}}[[File:Viridor Dunbar.png|290px|left|Viridor Beddington]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=PPC/A/1032878|id=51}}


==Summary==
==Summary==
Line 13: Line 12:
The plant comprises 2 lines via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 320,000 tonnes per annum based on a prepared [[WDF]] fuel [[CV]] of 10MJ/kg<ref>[http://www.volund.dk/~/media/Downloads/Brochures_-_WTE/Dunbar_-_Scotland.pdf B&W Volund Website]</ref>.
The plant comprises 2 lines via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 320,000 tonnes per annum based on a prepared [[WDF]] fuel [[CV]] of 10MJ/kg<ref>[http://www.volund.dk/~/media/Downloads/Brochures_-_WTE/Dunbar_-_Scotland.pdf B&W Volund Website]</ref>.


==Local Authority Users==
==Local Authority Data==
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste.
{{#clear_external_data:}}
{{EAIn|EPR={{#var: epr}}}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='PPC/A/1032878'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />