Dunbar EfW (Oxwellmains EfW): Difference between revisions
m expanded text |
add page specific text |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|PPC/A/1032878}}[[Category:EfW Plants]] | ||
[[ | An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Dunbar has permitted operational capacity of 300,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/dunbar-erf/ Viridor Website]</ref> mainly in the form of a prepared [[RDF]]{{EfWTemplate|EPR={{#var:epr}}|id=51}}[[File:Viridor Dunbar.png|290px|left|Viridor Beddington]]__TOC__<br clear='left' /> | ||
{{EfWTemplate|EPR= | |||
==Summary== | ==Summary== | ||
Line 13: | Line 12: | ||
The plant comprises 2 lines via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 320,000 tonnes per annum based on a prepared [[WDF]] fuel [[CV]] of 10MJ/kg<ref>[http://www.volund.dk/~/media/Downloads/Brochures_-_WTE/Dunbar_-_Scotland.pdf B&W Volund Website]</ref>. | The plant comprises 2 lines via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 320,000 tonnes per annum based on a prepared [[WDF]] fuel [[CV]] of 10MJ/kg<ref>[http://www.volund.dk/~/media/Downloads/Brochures_-_WTE/Dunbar_-_Scotland.pdf B&W Volund Website]</ref>. | ||
==Local Authority | ==Local Authority Data== | ||
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste. | |||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> |