Wilton 11 EfW: Difference between revisions
m expanded text |
changed capacity |
||
| (10 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|XP3436WB}} | ||
[[ | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 500,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=9}} | |||
[[File:Suez Wilton 11.png|350px|left|Suez-Semcorp EFW]]__TOC__ | |||
<br clear='left' /> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has permitted operational capacity of | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 500,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>. | ||
==History== | ==History== | ||
| Line 10: | Line 12: | ||
==Plant== | ==Plant== | ||
Built by [[CNIM]] and [[Clugson]] construction started in 2014 and completed 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]]. | Built by [[CNIM]] and [[Clugson]] construction started in 2014 and was completed in 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]]. | ||
= | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||