Wilton 11 EfW: Difference between revisions

Northern Chick (talk | contribs)
Bin52 (talk | contribs)
changed capacity
 
(9 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[File:Suez Wilton 11.png|350px|left|Suez-Semcorp EFW]]
{{#vardefine:epr|XP3436WB}}
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=XP3436WB|id=9}}
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 500,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>.
 
{{EfWTemplate|EPR={{#var:epr}}|id=9}}
[[File:Suez Wilton 11.png|350px|left|Suez-Semcorp EFW]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 444,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>.
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 500,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>.


==History==
==History==
Line 10: Line 12:


==Plant==
==Plant==
Built by [[CNIM]] and [[Clugson]] construction started in 2014 and completed 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]].
Built by [[CNIM]] and [[Clugson]] construction started in 2014 and was completed in 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]].


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}


{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />