[[Tilbury Green Power]] (TGP) is a renewable power plant fuelled by [[Wood Waste]], located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MWe<ref name="TGP" />.
{{BiomassPlant|NAME = Tilbury|id=82}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|KP3936ZB}}
{{BiomassPlant|NAME = Tilbury Green Power|id=82|EPR={{#var: epr}}}}
[[File:TGP.png|300px|left|Picture from 2019 Annual Report Cover Page]]__TOC__
<br clear='left'/>
==Summary==
==Summary==
Tilbury Green Power Limited (TGP) is a renewable power plant fuelled by waste wood located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MW and produces up to 319,000 MWh of renewable electricity each year which supplies on average, around 97,000 homes<ref name="TGP" />.
[[Tilbury Green Power]] (TGP) is a renewable power plant fuelled by [[Wood Waste]], located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MWe<ref name="TGP" />.


The plant uses around 270,000 tonnes of waste wood per annum<ref name="TGP" /> which is provided by Stobart Biomass who source the waste wood fuel for the plant from the local catchment area whcih is then processed at the onsite facility<ref name="GIB">[https://greeninvestmentgroup.com/news-and-insights/2015/uk-green-investment-bank-and-esb-support-new-190m-renewable-electricity-plant-on-the-thames/ Green Investment Bank]</ref>.
The Tilbury Green Power Plant was developed by [[Tilbury Green Power Limited]], the major shareholders at the time being the [[Electricity Supply Board]] (ESB) and the [[UK Green Investment Bank]] (GIB) (now called [[Green Investment Group]]). [[Burmeister and Wain Scandinavian Contractor]] (BWSC) and [[Aalborg Energie Technik]] (AET) were minor shareholders<ref name="TGP" />. GIB and ESB each invested £35m to the project as a combination of equity and shareholder loans, with an additional £2m participation from the technology provider AET<ref name="GIB" />. Senior debt funding was provided by the [[Danish Export Credit Agency]] (Eksport Kredit Fonden), [[Investec]] and [[Rabobank]]<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>. The total cost of the project amounted to £190m<ref name ="GIB" />.


The Tilbury Green Power Plant was developed by Tilbury Green Power Limited, the major shareholders of whom are Electricity Supply Board (ESB) and the UK Green Investment Bank (GIB). Burmeister and Wain Scandinavian Contractor (BWSC) and AET are minor shareholders<ref name="TGP" />. GIB and ESB each invested £35m to the project as a combination of equity and shareholder loans, with an additonal £2m participation from the technology provider AET<ref name="GIB" />. Senior debt funding was provided by the Danish Export Credit Agency (Eksport Kredit fonden), Investec and Rabobank<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>.
In June 2021 the facility was acquired by two new shareholders - [[Altri SGPS S.A]] through its wholly owned subsidiary [[Greenvolt]] (51% of the shares) and [[Equitex]] (49% of the shares) for a value of £245.5m<ref>[http://www.altri.pt/~/media/Files/A/Altri-V2/press-release/2021/Altri20210607EN.pdf altri Press release June 2021]</ref>.
 
The project is being progressed in two phases with Phase 1 already operational and Phase 2 awaiting construction [[Tilbury Docks - Phase 2 (EfW)]]. The original planning consent for the site permitted the total capacity to be  60MWe with an overall waste processing limit of 650,000 tonnes per year with [[Solid Recovered Fuel]] also being permitted up to a total tonnage of 170,000 tonnes. A variation to this planning consent has now been granted, which will allow the site to operate up to 80 MWe and the use of [[Solid Recovered Fuel]] up to 350,000 tonnes per annum<ref>ENDS</ref>


==Plant==
==Plant==
The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. BWSC were appointed the EPC contractor and O&M contractor for the project.
The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. [[BWSC]] were appointed the [[EPC]] contractor and [[O&M]] contractor for the project<ref name="GIB" /> with [[AET]] designing, supplying and commissioning the boiler, flue gas and combustion systems, the latter of which is based upon the travelling [[grate]] ([[AET Biograte]]) system<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>.
 
{{BioSustain|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}


The plant uses up to 270,000 tonnes of [[Wood Waste]] per annum<ref name="TGP" /> which is provided by [[Stobart Biomass]] who source the fuel for the plant from the local catchment area, which is then processed at the onsite facility<ref name="GIB">[https://greeninvestmentgroup.com/news-and-insights/2015/uk-green-investment-bank-and-esb-support-new-190m-renewable-electricity-plant-on-the-thames/ Green Investment Bank]</ref>.