[[Tilbury Green Power]] (TGP) is a renewable power plant fuelled by [[Wood Waste]], located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MWe<ref name="TGP" />.
{{BiomassPlant|NAME = Tilbury|id=82}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|KP3936ZB}}
{{BiomassPlant|NAME = Tilbury Green Power|id=82|EPR={{#var: epr}}}}
[[File:TGP.png|300px|left|Picture from 2019 Annual Report Cover Page]]__TOC__
<br clear='left'/>
==Summary==
==Summary==
Tilbury Green Power Limited (TGP) is a renewable power plant fuelled by waste wood located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MW and produces up to 319,000 MWh of renewable electricity each year which supplies on average, around 97,000 homes<ref name="TGP" />.
[[Tilbury Green Power]] (TGP) is a renewable power plant fuelled by [[Wood Waste]], located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MWe<ref name="TGP" />.


The plant uses around 270,000 tonnes of waste wood per annum<ref name="TGP" /> which is provided by Stobart Biomass who source the waste wood fuel for the plant from the local catchment area which is then processed at the onsite facility<ref name="GIB">[https://greeninvestmentgroup.com/news-and-insights/2015/uk-green-investment-bank-and-esb-support-new-190m-renewable-electricity-plant-on-the-thames/ Green Investment Bank]</ref>.
The Tilbury Green Power Plant was developed by [[Tilbury Green Power Limited]], the major shareholders at the time being the [[Electricity Supply Board]] (ESB) and the [[UK Green Investment Bank]] (GIB) (now called [[Green Investment Group]]). [[Burmeister and Wain Scandinavian Contractor]] (BWSC) and [[Aalborg Energie Technik]] (AET) were minor shareholders<ref name="TGP" />. GIB and ESB each invested £35m to the project as a combination of equity and shareholder loans, with an additional £2m participation from the technology provider AET<ref name="GIB" />. Senior debt funding was provided by the [[Danish Export Credit Agency]] (Eksport Kredit Fonden), [[Investec]] and [[Rabobank]]<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>. The total cost of the project amounted to £190m<ref name ="GIB" />.


The Tilbury Green Power Plant was developed by Tilbury Green Power Limited, the major shareholders of whom are Electricity Supply Board (ESB) and the UK Green Investment Bank (GIB). Burmeister and Wain Scandinavian Contractor (BWSC) and AET are minor shareholders<ref name="TGP" />. GIB and ESB each invested £35m to the project as a combination of equity and shareholder loans, with an additonal £2m participation from the technology provider AET<ref name="GIB" />. Senior debt funding was provided by the Danish Export Credit Agency (Eksport Kredit fonden), Investec and Rabobank<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>.
In June 2021 the facility was acquired by two new shareholders - [[Altri SGPS S.A]] through its wholly owned subsidiary [[Greenvolt]] (51% of the shares) and [[Equitex]] (49% of the shares) for a value of £245.5m<ref>[http://www.altri.pt/~/media/Files/A/Altri-V2/press-release/2021/Altri20210607EN.pdf altri Press release June 2021]</ref>.
 
The project is being progressed in two phases with Phase 1 already operational and Phase 2 awaiting construction [[Tilbury Docks - Phase 2 (EfW)]]. The original planning consent for the site permitted the total capacity to be  60MWe with an overall waste processing limit of 650,000 tonnes per year with [[Solid Recovered Fuel]] also being permitted up to a total tonnage of 170,000 tonnes. A variation to this planning consent has now been granted, which will allow the site to operate up to 80 MWe and the use of [[Solid Recovered Fuel]] up to 350,000 tonnes per annum<ref>ENDS</ref>


==Plant==
==Plant==
The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. BWSC were appointed the EPC contractor and O&M contractor for the project.
The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. [[BWSC]] were appointed the [[EPC]] contractor and [[O&M]] contractor for the project<ref name="GIB" /> with [[AET]] designing, supplying and commissioning the boiler, flue gas and combustion systems, the latter of which is based upon the travelling [[grate]] ([[AET Biograte]]) system<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>.
 
{{BioSustain|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}


The plant uses up to 270,000 tonnes of [[Wood Waste]] per annum<ref name="TGP" /> which is provided by [[Stobart Biomass]] who source the fuel for the plant from the local catchment area, which is then processed at the onsite facility<ref name="GIB">[https://greeninvestmentgroup.com/news-and-insights/2015/uk-green-investment-bank-and-esb-support-new-190m-renewable-electricity-plant-on-the-thames/ Green Investment Bank]</ref>.
==References==
==References==

Latest revision as of 09:33, 18 May 2024

Tilbury Green Power (TGP) is a renewable power plant fuelled by Wood Waste, located within the Port of Tilbury on the banks of the River Thames[1]. The plant has a capacity of around 40 MWe[1].


Tilbury Green Power
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Western Biomass Operating Company
Capacity 40 MWe
Feedstock Waste Wood
EPR (Waste Licence) KP3936ZB
ROC Yes
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 83921 0 0 0 83921
2019 95444 0 0 0 95444
2020 226738 0 0 0 226738
2021 256622 0 0 0 256622
2022 232999 0 0 0 232999


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 4744 5.65% 1242 1.48%
2019 5995 6.28% 1810 1.90%
2020 1224 0.54% 4709 2.08%
2021 16888 6.58% 5525 2.15%
2022 15659 6.72% 4972 2.13%

Picture from 2019 Annual Report Cover Page
Picture from 2019 Annual Report Cover Page


Summary

Tilbury Green Power (TGP) is a renewable power plant fuelled by Wood Waste, located within the Port of Tilbury on the banks of the River Thames[1]. The plant has a capacity of around 40 MWe[1].

The Tilbury Green Power Plant was developed by Tilbury Green Power Limited, the major shareholders at the time being the Electricity Supply Board (ESB) and the UK Green Investment Bank (GIB) (now called Green Investment Group). Burmeister and Wain Scandinavian Contractor (BWSC) and Aalborg Energie Technik (AET) were minor shareholders[1]. GIB and ESB each invested £35m to the project as a combination of equity and shareholder loans, with an additional £2m participation from the technology provider AET[2]. Senior debt funding was provided by the Danish Export Credit Agency (Eksport Kredit Fonden), Investec and Rabobank[3]. The total cost of the project amounted to £190m[2].

In June 2021 the facility was acquired by two new shareholders - Altri SGPS S.A through its wholly owned subsidiary Greenvolt (51% of the shares) and Equitex (49% of the shares) for a value of £245.5m[4].

The project is being progressed in two phases with Phase 1 already operational and Phase 2 awaiting construction Tilbury Docks - Phase 2 (EfW). The original planning consent for the site permitted the total capacity to be 60MWe with an overall waste processing limit of 650,000 tonnes per year with Solid Recovered Fuel also being permitted up to a total tonnage of 170,000 tonnes. A variation to this planning consent has now been granted, which will allow the site to operate up to 80 MWe and the use of Solid Recovered Fuel up to 350,000 tonnes per annum[5]

Plant

The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019[1]. BWSC were appointed the EPC contractor and O&M contractor for the project[2] with AET designing, supplying and commissioning the boiler, flue gas and combustion systems, the latter of which is based upon the travelling grate (AET Biograte) system[6].

Annual Sustainability Tonnage Input/Fuel

The tonnage[7] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[8]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 223520 0 0 0 0 0 0 0 0 0
2019/20 0 107754 0 0 0 0 0 0 0 0 0
2018/19 0 171993 0 0 0 0 0 0 0 0 0
2017/18 0 0 0 0 0 0 0 0 0 0 0

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='KP3936ZB' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='KP3936ZB' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit KP3936ZB, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


The plant uses up to 270,000 tonnes of Wood Waste per annum[1] which is provided by Stobart Biomass who source the fuel for the plant from the local catchment area, which is then processed at the onsite facility[2].