Earls Gate Energy Centre: Difference between revisions
No edit summary |
mNo edit summary |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine: epr|PPC/A/1157446}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional [[combustion]] technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum (with a permit extension pending to take it to 274,000 tonnes), and will be a [[Combined Heat and Power]] facility, exporting 21.5 MW electricity and heat to the nearby chemical company [[CalaChem]] and to other adjacent industrial plants, with any excess power fed into the national grid. {{EfWTemplate|EPR={{#var: epr}}|id=148}}[[File:Earls Gate Energy Centre.jpg|400px|left|Earls Gate Energy Centre. Biothek Ecologic Fuel, 2018.]] | ||
<ref>Biothek Ecologic Fuel, 2018. [https://biothekecologic.com/energy-from-waste-chp-plant-to-power-scottish-industries/ Energy from waste CHP plant to power Scottish industries - Biothek Ecologic Fuel. Online. Biothek Ecologic Fuel. [Accessed 21 Feb. 2020].]</ref>__TOC__<br clear='left'/> | |||
==Summary== | ==Summary== | ||
An EfW facility based upon conventional combustion technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is | An [[EfW]] facility based upon conventional [[combustion]] technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum (with a permit extension pending to take it to 274,000 tonnes), and will be a [[Combined Heat and Power]] facility, exporting 21.5 MW electricity and heat to the nearby chemical company [[CalaChem]] and to other adjacent industrial plants, with any excess power fed into the national grid. The cost of the project is circa £200m, which was provided by the investors [[Brockwell Energy]], the [[Green Investment Group]] and [[Covanta]]. | ||
In March 2022 [[EQT]], the owner of Covanta (now branded [[Encyclis]], bought the interests of the [[Green Investment Group]] in this and three other projects ([[Rookery Pit Energy Recovery Facility (Rookery South)]], [[Protos EFW]], and [[Newhurst EFW]]) to leave [[Green Investment Group]] with no further interest in the projects<ref>https://www.endswasteandbioenergy.com/article/1748321/covanta-buys-gig-stakes-four-efw-plants</ref>. | |||
The facility was developed by [[Brockwell Energy]], and was originally planned to be operated by [[MES Environmental]] for a contract duration of 25 years. Subsequently [[Hitachi Zosen Inova]] were contracted to complete the construction of the plant and were awarded a 25 year contract to operate it<ref>https://www.hz-inova.com/hzi-wins-25-year-operations-maintenance-contract-at-the-earls-gate-waste-to-energy-centre/</ref>. | |||
The [[EfW]] will replace an existing gas-fired energy plant on the site. | |||
The facility was expected to become operational by the end of 2021<ref name="ref1" >Earls Gate Energy Centre, 2020. [https://earlsgateconstruction.co.uk/ Home - EARLS GATE ENERGY CENTRE. Online. [Accessed 21 Feb. 2020].]</ref> but ran into delays through the construction subsidiary of [[CNIM]] responsible for delivery of [[EfW]] projects running into financial difficulties in January 2022. This is also impacted a second plant under construction at [[Lostock Sustainable Energy Plant]]<ref>https://www.mrw.co.uk/news/mp-calls-to-halt-efw-as-builder-cnim-hits-financial-problems-28-01-2022/</ref>. | |||
The plant was reported as becoming operational in May 2024 on the [[Hitachi Zosen Inova]] LinkedIn page<ref>https://www.linkedin.com/company/hitachi-zosen-inova-former-ae&e-inova-former-von-roll-inova-/posts/?feedView=all</ref> and on the company website as February 2024<ref>https://www.encyclis.com/earls-gate/</ref>. | |||
==Technology== | ==Technology== | ||
The moving-grate combustion technology | The moving-[[grate]] [[combustion]] technology was provided by [[CNIM]]<ref name="ref2" >Brockwell Energy, 2020. [http://www.brockwellenergy.com/our-projects/energy-from-waste/earls-gate-energy-centre/ Brockwell Energy | Earls Gate Energy Centre. Online. Brockwellenergy.com. [Accessed 21 Feb. 2020].]</ref>. | ||
==Construction== | ==Construction== | ||
[[CNIM]] | [[CNIM]] was the original [[EPC]] contractor for this facility, with [[Clugston]] in charge of the civil engineering. Construction commenced in January 2019 and was scheduled to take 3 years, with commissioning ending and operations beginning in 2021<ref name="ref1" />. However, with [[CNIM]] falling into financial difficulty, and ultimate collapse, [[Hitachi Zosen Inova]] took over the completion of the construction and the [[O&M]] contract. | ||
==Waste Input== | ==Waste Input== | ||
The facility will accept residual waste as feedstock. | The facility will accept residual waste as feedstock. | ||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 12:58, 29 July 2024
An EfW facility based upon conventional combustion technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum (with a permit extension pending to take it to 274,000 tonnes), and will be a Combined Heat and Power facility, exporting 21.5 MW electricity and heat to the nearby chemical company CalaChem and to other adjacent industrial plants, with any excess power fed into the national grid.
Earls Gate Energy Centre Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | PPC/A/1157446 |
Operator | Encyclis |
Region | Scotland |
Operational Capacity | 274ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 21.60MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum (with a permit extension pending to take it to 274,000 tonnes), and will be a Combined Heat and Power facility, exporting 21.5 MW electricity and heat to the nearby chemical company CalaChem and to other adjacent industrial plants, with any excess power fed into the national grid. The cost of the project is circa £200m, which was provided by the investors Brockwell Energy, the Green Investment Group and Covanta.
In March 2022 EQT, the owner of Covanta (now branded Encyclis, bought the interests of the Green Investment Group in this and three other projects (Rookery Pit Energy Recovery Facility (Rookery South), Protos EFW, and Newhurst EFW) to leave Green Investment Group with no further interest in the projects[2].
The facility was developed by Brockwell Energy, and was originally planned to be operated by MES Environmental for a contract duration of 25 years. Subsequently Hitachi Zosen Inova were contracted to complete the construction of the plant and were awarded a 25 year contract to operate it[3].
The EfW will replace an existing gas-fired energy plant on the site.
The facility was expected to become operational by the end of 2021[4] but ran into delays through the construction subsidiary of CNIM responsible for delivery of EfW projects running into financial difficulties in January 2022. This is also impacted a second plant under construction at Lostock Sustainable Energy Plant[5].
The plant was reported as becoming operational in May 2024 on the Hitachi Zosen Inova LinkedIn page[6] and on the company website as February 2024[7].
Technology
The moving-grate combustion technology was provided by CNIM[8].
Construction
CNIM was the original EPC contractor for this facility, with Clugston in charge of the civil engineering. Construction commenced in January 2019 and was scheduled to take 3 years, with commissioning ending and operations beginning in 2021[4]. However, with CNIM falling into financial difficulty, and ultimate collapse, Hitachi Zosen Inova took over the completion of the construction and the O&M contract.
Waste Input
The facility will accept residual waste as feedstock.
References
- ↑ Biothek Ecologic Fuel, 2018. Energy from waste CHP plant to power Scottish industries - Biothek Ecologic Fuel. Online. Biothek Ecologic Fuel. [Accessed 21 Feb. 2020.]
- ↑ https://www.endswasteandbioenergy.com/article/1748321/covanta-buys-gig-stakes-four-efw-plants
- ↑ https://www.hz-inova.com/hzi-wins-25-year-operations-maintenance-contract-at-the-earls-gate-waste-to-energy-centre/
- ↑ 4.0 4.1 Earls Gate Energy Centre, 2020. Home - EARLS GATE ENERGY CENTRE. Online. [Accessed 21 Feb. 2020.]
- ↑ https://www.mrw.co.uk/news/mp-calls-to-halt-efw-as-builder-cnim-hits-financial-problems-28-01-2022/
- ↑ https://www.linkedin.com/company/hitachi-zosen-inova-former-ae&e-inova-former-von-roll-inova-/posts/?feedView=all
- ↑ https://www.encyclis.com/earls-gate/
- ↑ Brockwell Energy, 2020. Brockwell Energy | Earls Gate Energy Centre. Online. Brockwellenergy.com. [Accessed 21 Feb. 2020.]