Allerton Waste Recovery Park (EfW): Difference between revisions

No edit summary
Bin52 (talk | contribs)
No edit summary
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[File:Allerton.png|320px|left|Amey Cespa Allerton]]
{{#vardefine:epr|KP3808PN}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=NP3034CG|id=16}}
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.
 
{{EfWTemplate|EPR={{#var:epr}}|id=16}}
[[File:Allerton.png|320px|left|Amey Cespa Allerton]]__TOC__
<br clear='left'/>
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.  
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.  
Line 12: Line 14:
Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost.
Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost.
The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>.
The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>.
 
{{EfWLAData|EPR={{#var: epr}}}}
==Local Authority Users==
{{EAIn|EPR={{#var: epr}}}}
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='NP3034CG'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
 
==References==
==References==
<references />
<references />