Allerton Waste Recovery Park (EfW): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{#vardefine:epr|NP3034CG}}
{{#vardefine:epr|KP3808PN}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.  
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.  
Line 14: Line 14:
Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost.
Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost.
The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>.
The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>.
==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
 
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />