Allerton Waste Recovery Park (EfW): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
Line 1: Line 1:
{{#vardefine:epr|NP3034CG}}
{{#vardefine:epr|KP3808PN}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.  
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.