Allerton Waste Recovery Park (EfW): Difference between revisions
Arctellion (talk | contribs) No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|KP3808PN}} | ||
[[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>. | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>. | ||